F. Gerigk, S. Ramberger, R. Wegner, P. Ugena-Tirado

CCDTL (F. Gerigk)

  • yesterday was a video conference with BINP on the construction of the CCDTL support,
  • at CERN it was concluded that we need a bronze layer between cavity support pads and the frame to allow longitudinal movement (50 deg temp difference between support and cavities cause 0.5 mm long. movement of the outer cavities),
  • BINP has already foreseen a stress relief treatment (heat treatment) to achieve the required tolerances,
  • vertically the cavities will most likely be shimmed, because simulations on the deformation of the support showed maximum values of 0.2 - 0.3 mm (for extreme cases, which are unlikely to happen in reality),
  • CERN workshop is in the process of making a cost estimate for comparison with BINP price,

Windows (F. Gerigk)

  • revised price expected from Thales next week

India (F. Gerigk)

  • ongoing discussions on welding procedures

PIMS (R. Wegner, F. Gerigk)

  • In a meeting with the CERN workshop it was decided that the short module made of 2 cells (2 end discs - module N, 2 rings – module G and 1 disc – module G) would be sufficient to qualify the production process of discs and rings for the PIMS series production. Only the waveguide ring needs to be qualified separately.
  • analysis results of the 2nd welding test in Juelich arrived, 2 linear pieces are welded together, the photos look promising (https://twiki.cern.ch/twiki/pub/SPL/Minutes06May2011/Juelich_Linearer_Test.pdf), circular samples will be welded soon
  • IPJ replied that they can machine precision holes for the alignment arms into the discs which simplifies the arm design.

DTL (S. Ramberger)

  • CADINOX has completed the final machining of the RF-port. Currently the vacuum test is undertaken with the support of ESS-Bilbao.
  • Machining of prototype girders is now going on at three companies.
  • The first series parts of the first 10 drift tubes have been completed. There are delays on the other more complicated pieces.

-- RolfWegner - 06-May-2011

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf Juelich_Linearer_Test.pdf r1 manage 2235.2 K 2011-05-06 - 15:32 RolfWegner 2nd welding test Juelich, linear weld
Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2011-05-10 - RolfWegner
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright