F. Gerigk, S. Ramberger, M. Schuh, G. DeMichele, P. Tirado, Jim Billen, und Jim Stovall

Linac4

  • Meeting with company THALES:
    • Windows for L4 (modified 1MW CW window)
    • IOTs for low energy part in SPL (under consideration)

CCDTL

  • Set up circut model mit 5 cells (3 acc. cell. and 2 coupling cells). Not yet complete.

DTL

  • High Power Test ongoing
    • Problems with "yellow box" - under investigations
    • differences between Pfwd and Pcav (Prev=0) with higher signal generator level (for Pcav above 200kW): probably dark currents

HOM

  • Further analysis don in case of a chopped beam in longitudinal plane.
  • Darft of SPL Colaboration Meeting talk presented

N.B. SPL Colaboration Meeting: 11.11 -13.11.09

-- MarcelSchuh - 06-Nov-2009

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2009-11-09 - MarcelSchuh
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright