F. Gerigk, S. Ramberger, M. Schuh, G. DeMichele, P. Tirado
Linac4
- Meeting with company THALES:
- Windows for L4 (modified 1MW CW window)
- IOTs for low energy part in SPL (under consideration)
CCDTL
- Set up circut model mit 5 cells (3 acc. cell. and 2 coupling cells). Not yet complete.
DTL
- High Power Test ongoing
- Problems with "yellow box"
- differences in input and output power, probably dark currents - under investigations
HOM
- Further analysis don in case of a chopped beam in longitudinal plane.
- Darft of SPL Colaboration Meeting talk presented
N.B.
SPL Colaboration Meeting: 11.11 -13.11.09
--
MarcelSchuh - 06-Nov-2009