S. Ramberger, M. Schuh, M. Jarosz, J. Borkowski, N.Alharbi, G. DeMichele

DTL

  • Prototype: all drift tubes are installed, 3 with rubber biscuit, not 100% leak tight (10-7)
  • Transfer Bead-Pulling system next week and perform measurement to ajust post couplers length

Bead-Pulling Program

  • improving programm speed still ongoing to gain accuracy

Power Splitter

  • MWS simutlaton results with different arrangements of posts and rods

HOM

  • first results with R/Q(β) available. Resluts are in the same order of magnitude as with constant R/Q
  • chopping implemented - now each bunch per pulse can be chopped individually, simulations with 5 out of 8 bunches started

-- MarcelSchuh - 07 Aug 2009

Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2009-08-07 - MarcelSchuh
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright