S. Ramberger, M. Schuh, M. Jarosz, J. Borkowski, N.Alharbi, G. DeMichele

DTL

  • Prototype: all drift tubes are installed, 3 with rubber biscuit, not 100% leak tight (10-7)
  • Transfer Bead-Pulling system next week in bld. 169 and perform measurements for field stabilization as well as frequency measurements for comparison with old results.

Bead-Pulling Program

  • improving program speed still ongoing to gain accuracy
  • data processing before the integral implementation

Power Splitter

  • MWS simulation results with different arrangements of posts and rods to understand their behavior on the S-matrix.

HOM

  • first results with R/Q(β) available. Resluts are in the same order of magnitude as with constant R/Q
  • chopping implemented - now each bunch per pulse can be chopped individually, simulations with 5 out of 8 bunches started

-- MarcelSchuh - 07 Aug 2009

Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r2 - 2009-08-07 - GiovanniDeMichele
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright