F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado and M. Schuh
SPL
Buncher cavity
- Simulation model of 2 ramping cavities ready
- ramping possible, but klystron in saturation
- Model of power dissipation in buncher cavity in work
SM18
- Replaced Klystron broken, another klystron needed for HP test, meeting with O. Brunner on Monday
Linac4
- Moveable tuner technical spec under preparation.
DTL
- Remachine end cone of low energy end done
- Analyze and preparation of drift tube from Bilbao started
PIMS
- Finished simulation on module 2
- Started simulation on module 10
- used linear interpolation for starting point
- frequency error of 300kHz
HOM
--
MarcelSchuh - 07-May-2010