F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado and M. Schuh

SPL

Buncher cavity

  • Simulation model of 2 ramping cavities ready
    • ramping possible, but klystron in saturation
  • Model of power dissipation in buncher cavity in work

SM18

  • Replaced Klystron broken, another klystron needed for HP test, meeting with O. Brunner on Monday

Linac4

  • Moveable tuner technical spec under preparation.

DTL

  • Remachine end cone of low energy end done
  • Analyze and preparation of drift tube from Bilbao started

PIMS

  • Finished simulation on module 2
  • Started simulation on module 10
    • used linear interpolation for starting point
    • frequency error of 300kHz

HOM

-- MarcelSchuh - 07-May-2010

Topic attachments
I Attachment History Action SizeSorted ascending Date Who Comment
PDFpdf PosterIPAC10.pdf r1 manage 1437.6 K 2010-05-07 - 17:47 MarcelSchuh HOM IPAC10 poster
Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2010-05-10 - FrankGerigk
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright