Minutes RF structure meeting 08.04.2009
F. Gerigk, S. Ramberger, M. Schuh, G. DeMichele, F. Grespan
DTL
- Prototype still not leak tight after check with PVC plugs (SuitbertRamberger)
- De-Buncher cavity: further studies on-going (GiovanniDeMichele)
- Power coupler:
- first simulation results with reduced iris length of 270mm to be checked with second method (GiovanniDeMichele)
- principal mechanical design of coupler with PIMS dimensions (303mm) available (SuitbertRamberger)
- 2m stainless steel tube solution is under study (SuitbertRamberger)
- Drift tube thermal interlock system is part of L. Arnaudons work package, the proposal will be made that J. Marquez works on this system
All Linac4 cavities
- Automatic conditioning system will be built within our section (rack, hardware, software)
HOM
- Emittance growth simulation results for different HOM setups (MarcelSchuh)
- Further simulations with different HOM freqency spread and dirstibutions at machine line resonances to be done
--
MarcelSchuh - 08 Apr 2009