F. Gerigk, S. Ramberger, G. DeMichele and M.Schuh

Buncher cavity

  • Final tuning will be done at CERN

DTL

  • Delivery of the Bilbao drift tube for the high power test on the 10th week.

SPL

  • Two different copper models will be built (one at CERN, one at the Royal Holloway University) to measure various parameter e.g. Field profiles, HOM distribution
  • Video conference of WG2 (Cavities) 11.01.2010 at 4pm

HOM

  • 180 deg HFSS simulation model received from Sacley

-- MarcelSchuh - 08-Jan-2010

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2010-01-08 - MarcelSchuh
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright