F. Gerigk, S. Ramberger, G. DeMichele and M.Schuh
Buncher cavity
- Final tuning will be done at CERN
DTL
- Delivery of the Bilbao drift tube for the high power test on the 10th week.
SPL
- Two different copper models will be built (one at CERN, one at the Royal Holloway University) to measure various parameter e.g. Field profiles, HOM distribution
- Video conference of WG2 (Cavities) 11.01.2010 at 4pm
HOM
- 180 deg HFSS simulation model received from Sacley
--
MarcelSchuh - 08-Jan-2010