F. Gerigk, R. Wegner, G. DeMichele , P. Tirado, M. Schuh
General
- 5th SPL collaboration meeting 25.-26.11.2010. Indico
- Collaboration with INFN for Linac4 tuners
- Update on the design of the RF-Window
- Drawing for the jacks under approval
- Problems with new H- source when voltage is increased
- Bunker in the 3 MeV have to be removed by the end of the year for space reasons
PIMS:
- Technical review meeting took place on 07.10.2010
- Technical Kick-off meeting: 16.-17.10.2010
- Preparations for HP test ongoing
- Optimization of the tuner position in revised design of the wave-guide coupler
DTL
- Technical notes under preparations
HOM
- Repeated simulations with RF errors after bug have been found in the code
--
MarcelSchuh - 08-Oct-2010