F. Gerigk, R. Wegner, G. DeMichele , P. Tirado, M. Schuh

General

  • 5th SPL collaboration meeting 25.-26.11.2010. Indico
  • Collaboration with INFN for Linac4 tuners
  • Update on the design of the RF-Window
  • Drawing for the jacks under approval
  • Problems with new H- source when voltage is increased
  • Bunker in the 3 MeV have to be removed by the end of the year for space reasons

PIMS:

  • Technical review meeting took place on 07.10.2010
  • Technical Kick-off meeting: 16.-17.10.2010
  • Preparations for HP test ongoing
  • Optimization of the tuner position in revised design of the wave-guide coupler

DTL

  • Technical notes under preparations

HOM

  • Repeated simulations with RF errors after bug have been found in the code

-- MarcelSchuh - 08-Oct-2010

Topic attachments
I Attachment History Action Size Date Who Comment
Unknown file formatpptx Status8oct.pptx r1 manage 628.5 K 2010-10-08 - 17:00 UnknownUser  
Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2010-10-08 - FrankGerigk
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright