Minutes RF structure meeting 09.12.2008

M. Schuh, F.Gerigk, G. DeMichele, F. Grespan, R. Wegner

PIMS

  • simulation results for the PIMS wave guide coupler; estimation of losses in the coupler is similar to a calculation done in Grenoble. (RolfWegner)

DTL (see SPL/DriftTubeLinac/PrototypeMeasurements, SPL/DriftTubeLinac/PrototypeSimulations))

  • Q measurements with the same waveguide of CCDTL. Results have to be checked, if the measured Q value is that of cavity or that of the waveguide by short-cutting the waveguide. (GiovanniDeMichele)
  • Results of 3D Post Coupler simulations: accelerating field on the beam axis with PCs inserted.
  • 3D Simulation with thin rings simulating the join points of the DTL (end-cups and end-plates) to understand the low Q value of prototype.
  • SUPERFISH simulation to validate perturbation in equivalent circuit model. (FrancescoGrespan)

HOM

  • First longitudinal beam simuations with operation mode to be benchmarked agaist SUPERFISH (MarcelSchuh)

-- MarcelSchuh - 09 Dec 2008

Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r4 - 2008-12-09 - RolfWegner
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright