F. Gerigk, S. Ramberger, G. DeMichele,

DTL

  • Bilbao is going to build LINAC4 DTL drift tubes prototypes.
  • Visit to the Schmiedewerke Gröditz GmbH to follow the forging technique for the construction of the 2m long stainless tubes.
  • Power dissipation on the connecting guide between tank and waveguide to be checked with other simulations shifting the input port wall.
  • Beadpull measurements: at the moment the Kevlar thread cannot be used for the measurements. The mechanical system has to be modified ad hoc.
PIMS
  • a meeting has been held with the Soltan Institute for Nuclear Physics, Swierk, Poland regarding the welding tests and the series production of the PIMS. The discussion can be found at https://twiki.cern.ch/twiki/bin/view/SPL/SoltanInstituteMinutes11Jun09. (Note: the Soltan Institute should build also the last buncher cavity).
  • Construction of a mechanical support for the alignment of the PIMS. Each cavity will be supported by 3 “support box”. Each box will provide horizontal and vertical adjustments. Tambwe Kabunda (EN/MME) will carry out the construction.

Debuncher

  • transient and steady state circuital analysis on a RLC circuit considering the coupling strength beta. Circuital parameters to be fitted with frequency, energy, unloaded Q, beta, voltage.

-- GiovanniDeMichele - 16 Jun 2009

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2009-06-16 - GiovanniDeMichele
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright