Minutes RF structure meeting 13.02.2009

F.Gerigk, S. Ramberger, G. DeMichele, F. Grespan

CCDTL

  • Awaiting authorisation from CERN Management for increased cost

PIMS

DTL

  • Drift Tubes Design (SuitbertRamberger)
    • Thierry test the e-beam welding between end-cup and core with magnet inside, observing before without shielding then with aluminum shield
    • (?) different configuration of magnet (Halbach design and a different design)
  • Power coupler simulations (GiovanniDeMichele)
    • found agreement of 3D simulation rescaled to Prototype measurements (HFSS, MWS)
    • start simulation power coupler for Tank 1
  • Status of the circuit model (FrancescoGrespan)
    • good fit of the prototype frequency measurements with the circuit matrix results, taking into account of the next nearest coupling for the Posts
    • to do: simplified 3D simulation for geometrical parameter estimation

-- FrancescoGrespan - 20 Feb 2009

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2009-02-20 - FrancescoGrespan
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright