F. Gerigk, R. Wegner, P. Tirado, M. Schuh

Linac4

  • Tendering for RF Windows started
  • Solid state amplifier for buncher cavities tested successfully
  • Source: Decision taken to go for a caesiated source

DTL

  • Drawings changed (larger skrews) to be able to use Cu joints instead Al joints to avoid corrosion. Same issue to be solved for CCDTL
  • Contract for tuners under preparation

CCDTL

  • First module still not delivered to Novosibirsk
  • Design for Frame is progressing

PIMS

  • General agreement for contract with Soltan institute is under preparation
  • HP Test: Temperature measurements completed
  • WG-Tuner design finalized

HOM

  • Further features implemented in simulation code

-- MarcelSchuh - 14-Jan-2011

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2011-01-14 - FrankGerigk
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright