F. Gerigk, S. Ramberger, G. DeMichele , M. Schuh, and P. Tirado

DTL

  • Drift tube welding tests with alu dummy and real magnet were done. Results see:
  • Test stand booked until week 18

CCDTL

  • Frequency measurements started

PIMS

  • Construction is ongoing without problems
  • EBW:
    • Cost estimate from Julich on the way
    • Alternative cost estimate from CERN workshop
  • Looking for alternative Helicoflex supplier

HOM

  • Access to workstation to solve big HFSS models: access
  • Simulations with RF errors analyzed: RF error dominates in studied cases

SPL

  • WG2 (cavity) VC meeting - 11.01.10
  • Meeting: RF and Infrastructure-Upgrade SM18 - 24.01.10

-- MarcelSchuh - 15-Jan-2010

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2010-01-15 - MarcelSchuh
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright