F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado and M. Schuh

SPL

  • Status report of all involved labs at the SPL collaboration meeting together with ESS in Lund. Indico

Debuncher Cavity

  • Simulation finished for 3 different phase ramps at 20/40 mA and 20/40 μs including different effects
    • 50kV amplifier only sufficient for 40 μs
    • Beam dynamics in Booster still ok with 40 μs, better for 20 μs

CCDTL

  • Welders could not fulfill weld norms to 100%
  • Meeting next week at VNIITF (Snezhinsk)

DTL

  • Grid don't fulfill vacuum requirements:
    • Geometry changed: 2 bare solution most likely at the present stage - further investigations are ongoing.
  • condition with new magnet:
    • RF sensors have to be checked / recalibrated

PIMS

  • Simulations: only 4 modules left
  • RF design finished for debuncher cavity
  • Waveguide and short circuit are under construction (needed for HP test)

HOM

  • Study of two linacs for ESS FAB meeting (Indico)

-- MarcelSchuh - 16-Jul-2010

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2010-08-05 - MarcelSchuh
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright