F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado and M. Schuh
SPL
- Status report of all involved labs at the SPL collaboration meeting together with ESS in Lund. Indico
Debuncher Cavity
- Simulation finished for 3 different phase ramps at 20/40 mA and 20/40 μs including different effects
- 50kV amplifier only sufficient for 40 μs
- Beam dynamics in Booster still ok with 40 μs, better for 20 μs
CCDTL
- Welders could not fulfill weld norms to 100%
- Meeting next week at VNIITF (Snezhinsk)
DTL
- Grid don't fulfill vacuum requirements:
- Geometry changed: 2 bare solution most likely at the present stage - further investigations are ongoing.
- condition with new magnet:
- RF sensors have to be checked / recalibrated
PIMS
- Simulations: only 4 modules left
- RF design finished for debuncher cavity
- Waveguide and short circuit are under construction (needed for HP test)
HOM
- Study of two linacs for ESS FAB meeting (Indico
)
--
MarcelSchuh - 16-Jul-2010