F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado and M. Schuh

SPL

  • Status report of all involved labs at the SPL collaboration meeting together with ESS in Lund. Indico

Debuncher Cavity

  • Simulation finished for 3 different phase ramps at 20/40 mA and 20/40 μs including different effects
    • 50kV amplifier only sufficient for 40 μs
    • Beam dynamics in Booster still ok with 40 μs, better for 20 μs

CCDTL

  • Welders could not fulfill weld norms to 100%
  • Meeting next week at VNIITF (Snezhinsk)

DTL

  • Grid don't fulfill vacuum requirements:
    • Geometry changed: 2 bare solution most likely at the present stage - further investigations are ongoing.
  • condition with new magnet:
    • RF sensors have to be checked / recalibrated

PIMS

  • Simulations: only 4 modules left
  • RF design finished for debuncher cavity
  • Waveguide and short circuit are under construction (needed for HP test)

HOM

  • Study of two linacs for ESS FAB meeting (Indico)

-- MarcelSchuh - 16-Jul-2010


This topic: SPL > WebHome > Linac4Web > RFStructureMeetings > Minutes15Jul2010
Topic revision: r3 - 2010-08-05 - MarcelSchuh
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright