F. Gerigk, K. Schirm, R. Wegner

CCDTL (F. Gerigk)

  • For the transfer of funds from ISTC projects 2888 and 2889 to 3888 and 3889, M. Vretenar is asked to write a formal letter to ISTC,
  • The technical specifications for the CCDTL support have passed the engineering check and now under approval.
  • BINP is ready to make a commercial offer for the construction of the CCDTL support.
  • The material order for the supports should be ready by next week.

Jacks (F. Gerigk)

  • The engineering check of the technical specifications started last week

PIMS (R. Wegner)

  • The 2 test rings are machined, ports are machined and flanges are brazed. Cleaning of the big rings is difficult, procedure will be improved. It worked fine for 3 GHz test pieces.
  • Test piece for metrology check received at CERN, will be measured next week.
  • Grooves for vacuum check can be machined into the end discs by IPJ / CPL
  • Welding tests are conducted in Julich

-- RolfWegner - 15-Jul-2011

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2011-07-15 - RolfWegner
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright