F. Gerigk, K. Schirm, R. Wegner
CCDTL (F. Gerigk)
- For the transfer of funds from ISTC projects 2888 and 2889 to 3888 and 3889, M. Vretenar is asked to write a formal letter to ISTC,
- The technical specifications for the CCDTL support have passed the engineering check and now under approval.
- BINP is ready to make a commercial offer for the construction of the CCDTL support.
- The material order for the supports should be ready by next week.
Jacks (F. Gerigk)
- The engineering check of the technical specifications started last week
PIMS (R. Wegner)
- The 2 test rings are machined, ports are machined and flanges are brazed. Cleaning of the big rings is difficult, procedure will be improved. It worked fine for 3 GHz test pieces.
- Test piece for metrology check received at CERN, will be measured next week.
- Grooves for vacuum check can be machined into the end discs by IPJ / CPL
- Welding tests are conducted in Julich
--
RolfWegner - 15-Jul-2011