Minutes RF structure meeting 15.05.2009
F. Gerigk, S. Ramberger, G. DeMichele
General
The
3d version of the work package description on the accelerating structures has been published.(
FrankGerigk)
DTL
- Simulations ongoing for optimization on the DTL tanks.
- Cage modification for DTs cooling to assure constant flow speed. This will allow a reliable reading of the temperature on the top of the drift tube.
- Prototype: leakages are going to be checked with two aluminum end covers. Second end cover in preparation. (9/12 DTs missing) (SuitbertRamberger)
Debuncher cavity
Studies on the debuncher cavity phasing by a signal of different frequency. (
GiovanniDeMichele)
--
GiovanniDeMichele - 18 May 2009