Minutes RF structure meeting 17.04.2009

F. Gerigk, J. Stovall, G. DeMichele, F. Grespan

HOM

  • Simulation results on the HOM effect for different code inputs are ready in a paper for PAC09 (FrankGerigk). (Link FR5REP053.pdf)

PIMS

  • The Metrologie Service did the first analysis of the e-beam welding test made by Soltan Institut (PL):
  • PIMS prototype building postponed to March 2010 for a problem with the workshop machine.(FrankGerigk)

DTL

  • Power coupler: new Power Coupler dimension for DTL is under checking with different simulation methods in MWS (GiovanniDeMichele)
  • Bead pull measurements show that Cold Model needs to be realigned (probably disassembled) in order to validate first PC stabilization results from the equivalent circuit. (FrancescoGrespan)

-- FrancescoGrespan - 22 Apr 2009

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2009-04-22 - FrancescoGrespan
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright