F. Gerigk, S. Ramberger, R. Wegner, P. Tirado, M. Schuh
Linac4
- Planed to have beam in Booster from Linac4 in June 2013
- Window tendering: only a offer from Thales
- Movable tuners: keep transmission box to reduce vibration and enable easier maintenance later on
DTL
- Heat treatment under vacuum or protective atmosphere needed
PIMS
- Contract signed with institute in Poland, Bulletin article is pending
- Simulations for movable tuner in last PIMS module and buncher cavity. The goal is to use the same tuner dimensions as for the other tuners in other structures.
--
MarcelSchuh - 22-Feb-2011