PIMS (R. Wegner) Ni plating of flanges finished (collaborating institute) Brazing of flanges for tuners and ports is being performed 2 rings of short module are planned to be sent to Julich end of June EB welding sample, which was X-ray analysed at CERN, is sent to IPJ to cross-calibrate their setup New samples for a final EB welding test have been prepared and are sent to Julich

PIMS (P. Ugena-Tirado) The simulations on the tuning ring heights continue. Module 2 is finished and module 12 already started. 17juneTuningRingSimulations.pptx: Simulations of tuning rings for PIMS cavities

-- RolfWegner - 17-Jun-2011

Topic attachments
I Attachment History Action Size Date Who Comment
Unknown file formatpptx 17juneTuningRingSimulations.pptx r1 manage 210.8 K 2011-06-17 - 16:38 RolfWegner Simulations of tunung rings for PIMS cavities
Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2011-06-17 - RolfWegner
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright