F. Gerigk, J-M. Giguet, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena-Tirado

CCDTL (F. Gerigk)

DTL (S. Ramberger)

  • The girder T1S1 is in the final machining stage for the DT holes. Metrology results for the pre-machined girder T1S1 are expected for 23.11.
  • 7 drift tubes have been completed with weld 4.
  • The tank segment T1S1 is cleaned and ready for copper plating. The surface treatment workshop decided to change the copper plating bath.

PIMS (R. Wegner)

  • The last set of copper discs for the PIMS series has arrived at CERN and will be shipped to Poland in January.
  • The 2 test rings have been completely welded in Julich and will be transported to Poland by an external company.
  • The rough machining and thermal 1st treatment of the 1st waveguide ring were successful, the ellipticity is with roughly 0.2 mm (max-min) well within the allowed tolerance of 0.4 mm (see attachment Ring_Wave_Guide_-_SPLACPMZ0016p8.pdf)

-- RolfWegner - 17-Nov-2011

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2011-11-21 - RolfWegner
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright