Minutes17Nov2011
(2011-11-21,
RolfWegner
)
(raw view)
E
dit
A
ttach
P
DF
F. Gerigk, J-M. Giguet, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena-Tirado%BR%%BR% *CCDTL* (F. Gerigk) * truck to Russia being loaded today, * report of the visit to BINP here: [[https://twiki.cern.ch/twiki/bin/view/SPL/November6CCDTL][https://twiki.cern.ch/twiki/bin/view/SPL/November6CCDTL]] *DTL* (S. Ramberger) * The girder T1S1 is in the final machining stage for the DT holes. Metrology results for the pre-machined girder T1S1 are expected for 23.11. * 7 drift tubes have been completed with weld 4. * The tank segment T1S1 is cleaned and ready for copper plating. The surface treatment workshop decided to change the copper plating bath. *PIMS* (R. Wegner) * The last set of copper discs for the PIMS series has arrived at CERN and will be shipped to Poland in January. * The 2 test rings have been completely welded in Julich and will be transported to Poland by an external company. * The rough machining and thermal 1st treatment of the 1st waveguide ring were successful, the ellipticity is with roughly 0.2 mm (max-min) well within the allowed tolerance of 0.4 mm (see attachment [[%ATTACHURL%/Ring_Wave_Guide_-_SPLACPMZ0016p8.pdf][Ring_Wave_Guide_-_SPLACPMZ0016p8.pdf]]) -- Main.RolfWegner - 17-Nov-2011
Attachments
Attachments
Topic attachments
I
Attachment
History
Action
Size
Date
Who
Comment
pdf
Ring_Wave_Guide_-_SPLACPMZ0016p8.pdf
r2
r1
manage
168.6 K
2011-11-21 - 16:16
RolfWegner
E
dit
|
A
ttach
|
Watch
|
P
rint version
|
H
istory
: r2
<
r1
|
B
acklinks
|
V
iew topic
|
WYSIWYG
|
M
ore topic actions
Topic revision: r2 - 2011-11-21
-
RolfWegner
Log In
SPL
SPL Web
Create New Topic
Index
Search
Changes
Notifications
Statistics
Preferences
TWiki Text Formatting Rules
Twiki Registration
EventCalendar
3MeV Test Stand
Linac4Web
SplWeb
RFpowerPages
RestrictedInformation
Cern Search
TWiki Search
Google Search
SPL
All webs
Copyright