Minutes RF structure meeting 20.02.2009

F.Gerigk, M. Schuh, G. DeMichele, F. Grespan

CCDTL

  • green light from CERN management to go ahead with the ISTC contract,
  • material order can now go ahead (FrankGerigk)

DTL

  • Status of the circuit model (FrancescoGrespan)
    • latest results fit well with measurements at the prototype
    • at model with 4 small cells high second next neighbor influence was detected
    • estimation of capacitance in the same order of magnitude
    • run additional simulation to estimate capacitance as function of the post length
    • run additional simulation to estimate inductance as function of the distance of the post
    • try to fit calibration curves out of the simulation results
  • Power coupler simulations (GiovanniDeMichele)
    • first results
    • resonance frequency decreases with coupler, take into account during tank design (increase frequency).

HOM

  • Londitundinal beam dynamic (MarcelSchuh)
    • fast routine using linear fit of ET0 to do longitundinal beam dynamic simulation ready
    • error increases in comparison to exact field integration method at transition has to be checked
    • HOM loading in cavities and feedback to the beam implemented
  • HFSS simulations (MarcelSchuh)
    • simulate new beta = 1 geometry
    • geometry has to be adopted to get a flat top field in HFSS

-- MarcelSchuh - 20 Feb 2009

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2009-02-20 - FrankGerigk
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright