Minutes RF structure meeting 20.02.2009
F.Gerigk, M. Schuh, G. DeMichele, F. Grespan
CCDTL
- green light from CERN management to go ahead with the ISTC contract,
- material order can now go ahead (FrankGerigk)
DTL
- Status of the circuit model (FrancescoGrespan)
- latest results fit well with measurements at the prototype
- at model with 4 small cells high second next neighbor influence was detected
- estimation of capacitance in the same order of magnitude
- run additional simulation to estimate capacitance as function of the post length
- run additional simulation to estimate inductance as function of the distance of the post
- try to fit calibration curves out of the simulation results
- Power coupler simulations (GiovanniDeMichele)
- first results
- resonance frequency decreases with coupler, take into account during tank design (increase frequency).
HOM
- Londitundinal beam dynamic (MarcelSchuh)
- fast routine using linear fit of ET0 to do longitundinal beam dynamic simulation ready
- error increases in comparison to exact field integration method at transition has to be checked
- HOM loading in cavities and feedback to the beam implemented
- HFSS simulations (MarcelSchuh)
- simulate new beta = 1 geometry
- geometry has to be adopted to get a flat top field in HFSS
--
MarcelSchuh - 20 Feb 2009