Minutes RF structure meeting 20.03.2009

S. Ramberger, G. DeMichele, F. Grespan

LINAC4 (General)

  • discussion on the de-buncher phase problem, in particular the longitudinal painting scheme into the PSB.

DTL

  • Power Coupler Simulation: height of the iris coupler 75 mm, taking into account all the safety margins (GiovanniDeMichele)
  • Circuit Model: fitting parameter method based on frequency measurements; simulations of PC stabilization effects using the circuit. (FrancescoGrespan)

-- FrancescoGrespan - 20 Mar 2009

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2009-03-20 - FrancescoGrespan
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright