Minutes RF structure meeting 20.03.2009
S. Ramberger, G. DeMichele, F. Grespan
LINAC4 (General)
- discussion on the de-buncher phase problem, in particular the longitudinal painting scheme into the PSB.
DTL
- Power Coupler Simulation: height of the iris coupler 75 mm, taking into account all the safety margins (GiovanniDeMichele)
- Circuit Model: fitting parameter method based on frequency measurements; simulations of PC stabilization effects using the circuit. (FrancescoGrespan)
--
FrancescoGrespan - 20 Mar 2009