Minutes RF structure meeting 20.03.2009

S. Ramberger, G. DeMichele, F. Grespan

LINAC4 (General)

  • discussion on the de-buncher phase problem, in particular the longitudinal painting scheme into the PSB.

DTL

  • Power Coupler Simulation: height of the iris coupler 75 mm, taking into account all the safety margins (GiovanniDeMichele)
  • Circuit Model: fitting parameter method based on frequency measurements; simulations of PC stabilization effects using the circuit. (FrancescoGrespan)

-- FrancescoGrespan - 20 Mar 2009


This topic: SPL > WebHome > Linac4Web > RFStructureMeetings > Minutes20March2009
Topic revision: r1 - 2009-03-20 - FrancescoGrespan
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright