S. Ramberger, M. Schuh, G. DeMichele and P. Tirado

CCDTL

  • Circuit model amoust complete, losses still have to be included
  • Detailed presentation next meeting
  • Measurements on the CCDTL planed

DTL

  • High Power Test ongoing
    • Operating with 50Hz and 1.5ms pulses. Breakdowns observed (max PCAV=170kW)
    • X-ray measurments done with the detector on the side and on beam axis at different powers (waiting for data)
    • Operating with 30Hz and 1.5ms pulses. Breakdowns observed (max PCAV=180kW)
    • Until now the designed power (220kW, taking into account the 80% of the Q) has been reached up to 4% d.c. (20Hz, 2msec)
    • CW run with 24kW over weekend
      • Max temperature: 70°C for the end-cones
  • At the L4 BCC-8 meeting, beam dynamics people presented their commissioning strategy which foresees for commissioning that the DTL tank1 is driven at up to 110% the nominal voltage however at a beam current close to 0. The feasibility needs to be checked.

HOM

  • High frequency chopping causes a significant emittance growth, if Qex exeeds 105. Only certain high frequency chopping patterns are foreseen in SPL operation and can be fixed. This would allow tuning the HOMs away from resonance lines with slight cavity design changes.

-- MarcelSchuh - 20-Nov-2009

Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r4 - 2009-11-23 - SuitbertRamberger
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright