S. Ramberger, M. Schuh, G. DeMichele and P. Tirado

Linac4

  • Commissioning structures with 10% more voltage than nominal

CCDTL

  • Circuit model amoust complete, losses still have to be included
  • Detailed presentation next meeting
  • Measurements on the CCDTL planed

DTL

  • High Power Test ongoing
    • Operating with 50Hz and 1.5ms pulses. Break downs observed
    • X-ray measurment done (waiting for data)
    • Max temperature: 70C at 3l/min water flow rate
    • CW run with 24kW over weekend

HOM

  • High frequency chopping causes a significant emittance growth, if Qex exeeds 105. Only certain high frequency chopping patterns are foreseen in SPL operation and can be fixed. This would allow tuning the HOMs away from resonance lines with slight cavity design changes.

-- MarcelSchuh - 20-Nov-2009

Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2009-11-20 - MarcelSchuh
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright