TWiki
>
SPL Web
>
Linac4Web
>
RFStructureMeetings
>
Minutes21Mar2013
(2013-03-21,
FrankGerigk
)
(raw view)
E
dit
A
ttach
P
DF
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Tomoko Muranaka, Suitbert Ramberger, Rolf Wegner%BR%%BR% *CCDTL* (F. Gerigk) * module 4: one HC joint not yet leak tight *CECOM* (F. Gerigk) * planning for visit to see prototype, Y. Cuvet/J. Marques/M. Thibaut/J. Hansen *vacuum interlock for Linac4* (F. Gerigk) * David Landre: use pump current instead gauge measurement to relate to vacuum level, *Indian coupler* (F. Gerigk) * Frank: need to get radiography tests of welds, * Frank: need to ask for final technical note on production of the coupler (draft was sent on 8.11.12), *PIMS* (F. Gerigk, R. Wegner) * working on solution to make prepayment with Ivo Lobmaier: justification based on: all rough machining done for discs. * PIMS production meeting with Polish collaborators and with CERN workshop, summary in EDMS: [[https://edms.cern.ch/document/1272592/][https://edms.cern.ch/document/1272592/]] * goals for 2013 are the qualification of vacuum tests in Poland, the qualification of machining, 3 full PIMS cavities delivered to CERN and a 4th ready at NCBJ * goals for 2014 are the completion of the remaining 8 cavities and delivery to CERN until end of September * the first cavity shall quickly be completed at CERN and high power tested in order to confirm the production by milling and the surface quality, particularly on the nose cone tip -- Main.RolfWegner - 21-Mar-2013
E
dit
|
A
ttach
|
Watch
|
P
rint version
|
H
istory
: r3
<
r2
<
r1
|
B
acklinks
|
V
iew topic
|
WYSIWYG
|
M
ore topic actions
Topic revision: r3 - 2013-03-21
-
FrankGerigk
Log In
SPL
SPL Web
Create New Topic
Index
Search
Changes
Notifications
Statistics
Preferences
TWiki Text Formatting Rules
Twiki Registration
EventCalendar
3MeV Test Stand
Linac4Web
SplWeb
RFpowerPages
RestrictedInformation
Cern Search
TWiki Search
Google Search
SPL
All webs
Copyright