F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado, M. Schuh, and R. De Prisco

Linac4

  • Meeting: RF Distribution, structure RF tests
    • Power splitting adjustment via circulator (Setup: Klystron -> MagicT -> Circulator -> Structure)
    • Equipment list under preparation for new test area
  • Meeting: Water Distribution
    • No new equipment needed for testing
    • Tunnel: Feed water in middle of structure and extract at end of the structure; combine return line of 2 neighboring modules

CCDTL

  • Welder certification: test welds failed norm specification, redo test welding

Buncher cavity

  • Ready for vacuum test, start next Monday
  • RF test and Q value ok

DTL

  • Remachine end cone of low energy end

Cavity conditioning software

  • Manual under preparation

PIMS

  • Started Simulation on 160MeV module

HOM

  • Preparation of IPAC10 Proceeding

-- MarcelSchuh - 26-Apr-2010


This topic: SPL > WebHome > Linac4Web > RFStructureMeetings > Minutes23April2010
Topic revision: r2 - 2010-04-27 - FrankGerigk
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright