F. Gerigk, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena-Tirado

CCDTL (F. Gerigk)

DTL (S. Ramberger)

PIMS (R. Wegner)

  • The 2 test rings have arrived in the Soltan Institute (PIMS_welding_11_11.pdf).
  • A visit of the brazing experts from the Soltan Institute to CERN for participating in the brazing of the ridged waveguide connection for the Linac4 RFQ is being organised.

SM18 (R. Wegner)

  • Modulator tests have been performed, klystron test are foreseen beginning of next week. The installation of a test BPM has been discussed. Jean-Michel will do the vacuum installation. Read-out cable connections are available, just need to be located and connected in the control room.

-- RolfWegner - 24-Nov-2011

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf PIMS_welding_11_11_k.pdf r1 manage 171.2 K 2011-11-24 - 11:04 RolfWegner  
Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2011-11-24 - RolfWegner
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright