F. Gerigk, R. Wegner, G. DeMichele , P. Tirado and M. Schuh

SPL

  • R&D budget of 3MCHF/year
  • Next week SPL collaboration meeting together with ESS in Lund. Indico

Test of RF structure meeting

  • Tests will take place in SM18
  • First Linac4 (2011-2012) , SPL afterwards
  • 50Hz modulator from ESS in 2012
  • Rolf will coordinate the installations needed in SM18

SM18

  • Modulator from India (prototype) will be installed and replaced later with Linac4 modulator

DTL

  • Anodizing not compatible with vacuum.
    • Replace aluminum holder with stainless steel
    • Gold / nickel flashing under investigation

PIMS

  • Measurements:
    • 3 different setups used
    • Vacuum test next week
  • Drawing for T almost finished
  • Construction of short is progressing
  • Simulations:
    • Finished simulation on module 11, 12
    • Finish simulation of 2 modules per week

HOM

  • Simulation of HOM impact comparing 704MHz and 1300MHz cavities for ESS

-- MarcelSchuh - 28-Jun-2010

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2010-06-28 - MarcelSchuh
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright