F. Gerigk, J-M. Giguet, S. Ramberger, K. Schirm, R. Wegner

DTL (S. Ramberger) Metrology results after correction of tank T1S1 of CADINOX are expected on Monday 29 August 2011. Supplier of girder T1S2 is currently blocked as we are waiting for metrology results of the short prototype girder from CERN metrology. They are expected for Monday 29 August 2011. Further 10 drift tube sets (without stems - required later) from DMP arrived at CERN on 12 August 2011. Welding of the first batch of 9 drift tubes to start on 30 August 2011.

-- RolfWegner - 26-Aug-2011

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2011-08-26 - RolfWegner
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright