F. Gerigk, J-M. Giguet, S. Ramberger, K. Schirm, R. Wegner

DTL (S. Ramberger) • Metrology results after correction of tank T1S1 of CADINOX are expected on Monday 29 August 2011. • Supplier of girder T1S2 is currently blocked as we are waiting for metrology results of the short prototype girder from CERN metrology. They are expected for Monday 29 August 2011. • Further 10 drift tube sets (without stems - required later) from DMP arrived at CERN on 12 August 2011. • Welding of the first batch of 9 drift tubes to start on 30 August 2011.

-- RolfWegner - 26-Aug-2011

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2011-08-26 - RolfWegner
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright