F. Gerigk, S. Ramberger, G. DeMichele , M. Schuh, P. Tirado, and R. De Prisco
DTL
- Drift tube production: first 2 welds done of the drift tube that shall be tested in the prototype.
PIMS
- Prototype ready for low level measurement
- 50% less EB welds needed in series production - in contact with Juelich for new offer
- Transfer Bead Pull system for measurements at PIMS (action G. DeMichele)
- Tuning code from CCDTL adapted for PIMS - ready for measurements next week
- PC with Mathlab needed in Lab (action: F. Gerigk, P. Tirado)
CCDTL
- Two different drift tubes manufacturing processes will be shown at visit in Novosibirsk
Buncher Cavity
- Cavity arrived for Poland
- Several problems found during inspection
Cavity conditioning software
- Two different programs ready for testing
- Problems to connect to PLC - to be solved next week
SPL
- Continue as R&D program with the focus on a driver linac for a neutrino beam facility
HOM
- Beam dynamic simulations to study effect of charge scatter in case of off axis injected beam
- HFSS and MWS simulation to compare results for TM010
COMSOL test license
- G. DeMichele tested the RF and the CAD import module ( presentation)
--