F. Gerigk, S. Ramberger, G. DeMichele , M. Schuh, P. Tirado, and R. De Prisco

DTL

  • Drift tube production: first 2 welds done and machined

PIMS

  • Prototype ready for low level measurement
  • 50% less EB welds needed in series production - in contact with Juelich for new offer
  • Transfer Bead Pull system for measurements at PIMS (action G. DeMichele)
  • Tuning code from CCDTL adapted for PIMS - ready for measurements next week
  • PC with Mathlab needed in Lab (action: F. Gerigk, P. Tirado)

CCDTL

  • Two different drift tubes manufacturing processes will be shown at visit in Novosibirsk

Buncher Cavity

  • Cavity arrived for Poland
  • Several problems found during inspection

Cavity conditioning software

  • Two different programs ready for testing
  • Problems to connect to PLL - to be solved next week

SPL

  • Continue as R&D program with the focus on a driver linac for a neutrino beam facility

HOM

  • Beam dynamic simulations to study effect of charge scatter in case of off axis injected beam
  • HFSS and MWS simulation to compare results for TM010

COMSOL test license

  • G. DeMichele tested the RF and the CAD import module (presentation)

-- MarcelSchuh - 26-Feb-2010

Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2010-02-26 - MarcelSchuh
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright