F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado, M. Schuh, and R. De Prisco
General
- THALES: New branch, offers integration works, possible option for test stand upgrade
Linac4
- Meeting with THALES for Linac4 ceramic windows. Preliminary specs presented based on previous projects. Window length reduced from 1m to 40cm
ESS
- Bilbao: New technique presented to close dirft tube with a chemical bath, further studies are ongoing
- Visit test stand at CERN:
- Support for stand upgrade
- Test cavies at CERN
DTL
- Drift tube prototype production delayed
- Exchange drift tube in hot prototype when new drift tube ready
CCDTL
- Summary of visit at Novosibirsk is online
Cavity conditioning software
- Test of code under various conditions before Easter
- Code has to be adjusted for not preconditioned cavities
PIMS
- The different simulation results with HFSS/Microwave Studio vs Superfish/GdidL are understood (wrong setting for symmetry plane).
- Measurements and simulation data agree very well
- Measurements done with one remachined disk, good match with predicted values
- Only one tuning step will be needed, save one month on construction
HOM
- Results presented at DPG Spring Meeting 2010 Bonn
- Started writing beam dynamic summary for a journal paper publication
--
MarcelSchuh - 29-Mar-2010