F. Gerigk, S. Ramberger, G. DeMichele , P. Tirado

Linac4

  • accelerating structures high power test
    • dedicated place in bld 150 and/or SM18 updating under discussion
    • test stand in bld 112 seems to be a backup solution

Buncher cavity

  • Performed high power test (Pcav=23kW): NO problems noticed in conditioning

DTL

  • Drift tube from Bilbao
    • hydrocarbon contamination found in inside surface; silicone found on outside surface
    • at least outgassing of electroforming copper surface to be done
  • Corrosion test on the anodising magnet matrix: results in almost 3 weeks
  • Prototype high power test
    • klystron ELIA under conditioning
    • vacuum leak after the installation of the magnet in the LE end-cone: planned leak test on Monday; likely end-cone to be re-machined

PIMS

  • Welding on the prototype almost finished
  • Reduction of the tickness of the waveguide (under vacuum) and waveguide coupler under study
  • Simulations on modules ongoing
  • Agreements for the production with Juelich and Poland ongoing
  • Prototype high power test
    • likely the test will be done in the 3MeV test stand area: shielding for x-rays under consideration

-- GiovanniDeMichele - 31-May-2010

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2010-05-31 - GiovanniDeMichele
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright