F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado, M. Schuh

General

  • Waveguide window specification prepared to be reviewed by sLHC Spec. Board

CCDTL

  • First module will be shipped earliest Nov. 7th to Novosibirsk
  • Shipping material to Novosibirsk

DTL

  • Review of DTL design
  • Technical drawings ready within 2 weeks
  • Planning for tank assembly

PIMS

  • Meetings PIMS drawings
    • Support recalculated
    • Alignment outside tunnel
    • Drawings modified to fit all joints
  • EDMS Documents for technical specifications, movable tunes created
  • First LP PIMS test completed, HP test starts next week
  • Waveguide tuner position simulations completed

HOM

  • Comparison of different mesh options in HFSS.

-- MarcelSchuh - 01-Nov-2010

Topic attachments
I Attachment History Action Size Date Who Comment
Unknown file formatpptx Status29oct.pptx r1 manage 662.0 K 2010-11-02 - 11:12 UnknownUser  
Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2010-11-02 - unknown
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright