F. Gerigk, S. Ramberger, M. Schuh, P. Tirado
CCDTL
- Technical meeting was a success. All open issues were discussed
- Shipping list is under preparation
- Simulations:
- 2 modes found in 3 cell model with 2 coupling cells and one cell in short circuit. Further studies ongoing to understand model
PIMS
- Construction is ongoing
- Investigation is in progress, if EB welding could be done in Juelich
Buncher Cavity
- Feedback from Poland:
- Line inside cavity detected. It should not be an problem in later operation so no additional machining will be done.
DTL
- High Power Test ongoing
- about 250 kW in the cavity with more than L4 duty cycle (4Hz, 700
sec)
- Tilt sensitivity measurement is still under further analysis
- First drift tube with magnet inside is ready for final welding.
- Magnetic shielding is necessary
- Drift tube will be cut open afterwards and final checks will be done
- First “final” drift tube will be produced afterwards
HOM
- Analyzing longitudinal simulation results in case of a chopped beam. Effect of chopping seems to be an issue, especially if HOM hits a machine line generated by the chopping. Further analysis is needed to identify damping limits.
--
MarcelSchuh - 02-Nov-2009