S. Ramberger, M. Schuh, M. Jarosz, J. Borkowski
DTL
- Prototype: 4 more drift-tubes installed without problems. Install further drift-tubes and prepare for Bead-Pulling measurements
Bead-Pulling Program
- programs ready
- problems running DAQ and motor controll in parallel. PC appears to be overloaded. Using a faster PC could improve the situation.
Power Splitter
- MWS and HFSS simulations don't fit with each other. Check results with better mesh and running simulation on a more powerfull PC (PARC node).
HOM
- SRF09 abstract submitted
- first simulations with R/Q(β) are running
--
MarcelSchuh - 31 Jul 2009