S. Ramberger, M. Schuh, M. Jarosz, J. Borkowski

DTL

  • Prototype: 4 more drift-tubes installed without problems. Install further drift-tubes and prepare for Bead-Pulling measurements

Bead-Pulling Program

  • programs ready
  • problems running DAQ and motor controll in parallel. PC appears to be overloaded. Using a faster PC could improve the situation.

Power Splitter

  • MWS and HFSS simulations don't fit with each other. Check results with better mesh and running simulation on a more powerfull PC (PARC node).

HOM

  • SRF09 abstract submitted
  • first simulations with R/Q(β) are running

-- MarcelSchuh - 31 Jul 2009

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2009-07-31 - SuitbertRamberger
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright