Linac4 Parameter Table
shortcuts to
General linac parameters
,
Error amplitudes
,
Beam evolution
,
Ion source and LEBT
,
RFQ
,
MEBT
,
DTL
,
CCDTL
,
PIMS
,
Transfer line
,
PSB injection
EDMS documents on:
lengths and alignment tolerances for all linac elements
(still evolving)
estimates on the heat load for water/air cooling and electrical consumption for Linac4 and SPL duty cycle
Linac4 parameter list
magnet parameter list
General linac parameters
Parameter
PSB operation
LP-SPL operation
HP-SPL operation
Comment
Timestamp
Ion species
H
-
H
-
H
-
10 August 2007
Overall linac length
80.4 m
80.4 m
80.4 m
10 August 2007
Output energy
160
MeV
160
MeV
160
MeV
10 August 2007
Bunch frequency
352.2 MHz
352.2 MHz
352.2 MHz
10 August 2007
Max. repetition rate
1.1 Hz
2 Hz
50 Hz
11 March 2009
Beam pulse length
0.4 ms
1.2 ms
0.4 - 1.2 ms
useful beam
11 March 2009
Max. beam duty cycle
0.044%
0.24%
<6%
useful beam
11 March 2009
Beam head/tail
<60/20 us
t.b.d.
t.b.d.
dumped before PSB injection
3 June 2008
Chopper beam-on factor
65%
t.b.d
t.b.d.
10 August 2007
Source current
80 mA
40 mA
40 - 80 mA
max. values
11 March 2009
RFQ output current
66.5 mA
34 mA
34 - 66.5 mA
max. values
11 March 2009
Linac current
40 mA
20 mA
20 - 40 mA
max. values
11 March 2009
Average current
0.018 mA
0.05 mA
0.8 - 1.6 mA
max. values
11 March 2009
Max. beam power
2.8 kW
7.7 kW
128 - 256 kW
max. values
11 March 2009
Number of particles per pulse
1.0 x 10
14
1.5 x 10
14
1.0 - 2.0 x 10
14
max. values
11 March 2009
Number of particles per bunch
1.14 x 10
9
0.57 x 10
9
0.57 - 1.14 x
9
max.values
10 August 2007
Error amplitudes (Maximum, uniform distribution)
Parameter
Value
Comment
Timestamp
quad Quadrupole gradient
±0.5%
14 August 2007
quad Quadrupole displacement
±0.1 mm
14 August 2007
quad Quadrupole rotation (x,y)
±0.5 deg
14 August 2007
quad Quadrupole rotation (z)
±0.2 deg
14 August 2007
quad Cavity field phase
±1 deg
14 August 2007
quad Cavity field amplitude
±1%
14 August 2007
Beam evolution
Parameter
Source/LEBT
RFQ
MEBT
DTL
CCDTL
PIMS
transfer line
Comment
Timestamp
Output energy
45 kV
3.0
MeV
3.0
MeV
50
MeV
102
MeV
160
MeV
160
MeV
23 August 2007
Relativistic beta
0.0097882
0.079732
0.079732
0.31389
0.43164
0.51953
0.51953
23 August 2007
Peak current
80
70
62
62
62
62
62
23 August 2007
horizontal acceptance
-
norm. horiz. emittance (output) [pi-mm-mrad]
0.3
0.31
0.32
0.32
0.32
0.32
0.45
23 August 2007
vertical acceptance
-
norm. vert. emittance (output) [pi-mm-mrad]
0.3
0.31
0.32
0.32
0.32
0.32
0.42
23 August 2007
controlled beam loss
uncontrolled beam loss
longitudinal emittace [deg-MeV] (352 MHz)
0.14
0.17
0.18
0.18
0.18
-
23 August 2007
longitudinal emittance [pi-mm-mrad]
0.35
0.43
0.45
0.45
0.45
-
23 August 2007
Ion source and LEBT
Parameter
Value
Comment
Timestamp
Ion species
H
-
14 August 2007
Source current
80 mA
14 August 2007
Extraction voltage
45 kV
14 August 2007
Source length
1 m
14 August 2007
LEBT focusing type
two-solenoid
27 August 2007
LEBT length
1.9 m
14 August 2007
Vacuum
10
-5
mbar
14 August 2007
RFQ
Parameter
Value
Comment
Timestamp
Input energy
0.045
MeV
14 August 2007
Output energy
3.0
MeV
14 August 2007
RF frequency
352.2 MHz
14 August 2007
Peak current
70 mA
14 August 2007
Average pulse current
70 mA
14 August 2007
Design duty cycle
10%
14 August 2007
Voltage
81 kV
14 August 2007
Modulation factor
1.0--2.4
14 August 2007
Maximum surface field
1.95 kilpatrick
14 August 2007
RF beam power
207 kW
(70 mA)
14 August 2007
RF peak power (superfish)
537 kW
(superfish + 20% + beam)
14 August 2007
Number of klystrons
1
14 August 2007
Number of cells
300
14 August 2007
Length
3.00 m
14 August 2007
Beam aperture
3.0--1.8 mm
14 August 2007
Vacuum
10
-7
mbar
14 August 2007
MEBT (chopper line)
Chopper Line Diagram
Parameter
Value
Comment
Timestamp
Beam energy
3
MeV
14 August 2007
Peak current
66.5/62 mA
Input/output
14 August 2007
Average pulse current
66.5/40 mA
Input/output
14 August 2007
Effective chopper plate voltage
>400 V
Seen by beam
27 August 2007
Chopper plate voltage
>500 V
27 August 2007
Chopper rise/fall time
< 2 ns
10--90%
14 August 2007
Chopper repetition rate
1--50 Hz
14 August 2007
Maximum chopping factor
40%
14 August 2007
Chopper deflection angle
>5.3 mrad
27 August 2007
RF frequency buncher cavities
352.2 MHz
14 August 2007
Maximum buncher voltage
150 kV
14 August 2007
RF peak power per buncher
16--18 kW
14 August 2007
Number of buncher cavities
3
At 352.2 MHz
14 August 2007
Number of chopper structures
2
Inside quadrupoles
14 August 2007
Number of quadrupoles
11
14 August 2007
Length of chopper plates
400 mm
14 August 2007
Chopper plate distance
20 mm
14 August 2007
Length
3.7 m
14 August 2007
Beam collimation
approx 7%
14 August 2007
Vacuum
10
-7
mbar
14 August 2007
Beam size Chopper Line
DTL
DTL Diagram
Parameter
Value
Comment
Timestamp
Input energy
3
MeV
14 August 2007
Output energy
50
MeV
15 August 2007
RF frequency
352.2 MHz
15 August 2007
Average pulse current
40 mA
15 August 2007
Design RF duty cycle
10%
15 August 2007
Accelerating field E
0
3.2 MV/m
15 August 2007
Maximum surface field
1.6/1.4/1.3 kilpatrick
1st/2nd/3d tank
15 August 2007
Synchrotron phase
-30 to -20/ -20 deg
1st / (2nd,3rd) tank
15 August 2007
RF beam power
1.88 MW
15 August 2007
RF peak power per tank
0.95/1.92/1.85 MW
1st/2nd/3rd tank
15 August 2007
RF peak power
4.7 MW
15 August 2007
Number of klystrons
1/1/1
1st/2nd/3rd tank
15 August 2007
Cells per tank
36/42/30
1st/2nd/3rd tank
15 August 2007
Number of tanks
3
15 August 2007
Focusing tank 1
FOFODODO
15 August 2007
Focusing tank 2/3
FOFODODO
??
15 August 2007
Length per tank
3.63/7.38/7.25 m
1st/2nd/3rd tank
7 March 2008
Total length
18.7 m
15 August 2007
Transition to CCDTL
0.64 m
15 August 2007
Beam aperture
20 mm
15 August 2007
Quadrupole type
PMQ
15 August 2007
Quadrupole length
45/80 mm
1st / (2nd,3rd) tank
15 August 2007
Number of quadrupoles
111
15 August 2007
Outer drift tube diameter
90 mm
15 August 2007
Inner quadr.~diameter
22 mm
15 August 2007
Vacuum
10
-7
mbar
15 August 2007
Beam size DTL
CCDTL
CCDTL Diagram
Parameter
Value
Comment
Timestamp
Input energy
50
MeV
14 August 2007
Output energy
102.9
MeV
16 September 2008
RF frequency
352.2 MHz
15 August 2007
Average pulse current
40 mA
15 August 2007
Design RF duty cycle
14%
15 August 2007
Accelerating field E
0
4--4.3 MV/m
3 March 2008
Maximum surface field
1.6--1.7 kilpatrick
3 March 2008
Synchr. phase
-20 deg
15 August 2007
RF beam power
2.1 MW
20 October 2008
RF power per module
0.95--1.0 MW
3 March 2008
RF peak power
7.0 MW
3 March 2008
Number of klystrons
7
3 March 2008
Cells per cavity
3
15 August 2007
Cavities per module
3
15 August 2007
Number of cavities
21
3 March 2008
Number of modules
7
3 March 2008
Number of quadrupoles
21
3 March 2008
Focusing
FODO
15 August 2007
Length
25.0 m
3 March 2008
Transition to PIMS
1.2 m
15 August 2007
Beam aperture
28 mm
15 August 2007
Vacuum
10
-7
mbar
15 August 2007
Beam size CCDTL
PIMS
PIMS Diagram
Parameter
Value
Comment
Timestamp
Input energy
102.9
MeV
16 September 2008
Output energy
160
MeV
15 August 2007
RF frequency
352.2 MHz
15 August 2007
Average pulse current
40 mA
15 August 2007
Design RF duty cycle
10%
15 August 2007
Accelerating field E_0
3.9--4 MV/m
15 August 2007
Maximum surface field
<1.8 kilpatrick
15 August 2007
Synchrotron phase
-20 deg
15 August 2007
RF beam power
2.3 MW
15 August 2007
RF peak power
11.9 MW
15 August 2007
Number of klystrons
4+4
high-power + low-power (LEP)
15 August 2007
Cells per cavity
7
15 August 2007
Number of cavities
12
15 August 2007
Number of quadrupoles
12
15 August 2007
Focusing
FODO
15 August 2007
Length
21.5 m
15 August 2007
Beam aperture
40 mm
15 August 2007
Vacuum
10
-7
mbar
15 August 2007
Beam size PIMS
End to End Settings
Cavities Settings
Quadropole Settings
Transfer line
Parameter
Value
Comment
Timestamp
Input energy
160
MeV
14 August 2007
Output energy
160
MeV
15 August 2007
Total length
177.6 m
to PSB entrance
15 August 2007
Length of new section
70 m
to junction with Linac2 line (BHZ20)
15 August 2007
Number of RF cavities
1
5-cell pi-mode cavities at 352 MHz
15 August 2007
Cavity voltage
0.7 MV
to be confirmed
15 August 2007
Power per cavity
16.2 kW
to be confirmed
15 August 2007
Number of quadrupoles
13 + 18
new + old
15 August 2007
Quadrupole aperture
50 mm + 45 or 70 mm
new + old
15 August 2007
Number of bendings
2 + 2
new + old
15 August 2007
Vacuum
10
-7
mbar
15 August 2007
--
FrankGerigk
- 10 Aug 2007
Attachments
Attachments
Topic attachments
I
Attachment
History
Action
Size
Date
Who
Comment
jpg
CCDTL.JPG
r1
manage
25.0 K
2011-06-17 - 12:42
ThomasSchipper
jpg
CCDTL_Diagram.JPG
r1
manage
38.2 K
2011-06-20 - 16:07
ThomasSchipper
jpg
Cavities_Settings.JPG
r1
manage
50.0 K
2011-06-22 - 14:14
ThomasSchipper
jpg
ChopperLine3.JPG
r1
manage
32.9 K
2011-06-20 - 15:47
ThomasSchipper
jpg
DTL.JPG
r1
manage
15.3 K
2011-06-17 - 12:35
ThomasSchipper
jpg
DTL2.JPG
r1
manage
20.7 K
2011-06-20 - 16:07
ThomasSchipper
jpg
Figure_Beamsize_CCDTL.JPG
r1
manage
30.7 K
2011-06-20 - 16:36
ThomasSchipper
jpg
Figure_Beamsize_Chopper_Line.JPG
r1
manage
22.9 K
2011-06-20 - 16:36
ThomasSchipper
jpg
Figure_Beamsize_DTL.JPG
r1
manage
28.3 K
2011-06-20 - 16:36
ThomasSchipper
jpg
Figure_Beamsize_PIMS.JPG
r1
manage
29.4 K
2011-06-20 - 16:36
ThomasSchipper
jpg
PIMS_Diagram.JPG
r1
manage
22.3 K
2011-06-20 - 16:06
ThomasSchipper
jpg
Quadropole_Settings.JPG
r1
manage
39.4 K
2011-06-22 - 15:11
ThomasSchipper
jpg
THE_Pims.JPG
r1
manage
26.2 K
2011-06-17 - 12:45
ThomasSchipper
E
dit
|
A
ttach
|
Watch
|
P
rint version
|
H
istory
: r36
<
r35
<
r34
<
r33
<
r32
|
B
acklinks
|
R
aw View
|
WYSIWYG
|
M
ore topic actions
Topic revision: r36 - 2011-07-10
-
ThomasSchipper
Log In
SPL
SPL Web
Create New Topic
Index
Search
Changes
Notifications
Statistics
Preferences
TWiki Text Formatting Rules
Twiki Registration
EventCalendar
3MeV Test Stand
Linac4Web
SplWeb
RFpowerPages
RestrictedInformation
Cern Search
TWiki Search
Google Search
SPL
All webs
Copyright