Minutes of the SPL steering group

meeting no. 11

date: 11 July 2008

present: E. Ciapala, R. Garoby, F. Gerigk, J. Tuckmantel, M. Vretenar

Agenda

1. General news and facts
2. Understanding of Q(f,T,B) (F. Gerigk)
3. xx)
4. Round table
5. Next meeting

1. General news and facts (R. Garoby)

  • During nufact'08 the latest results from the official HARP analysis group seem to indicate that at 5 GeV there is a good efficiency for pion production, contrary to many earlier claims which were pointing at much higher energies.
  • The Cockroft Institute (UK) is willing to establish a long-term commitment to CERN and a MoU is in preparation. Subjects include work on an RF distribution system and phase/amplitude shifters, which could be covered by Lancaster University (Prof. Carter), Daresbury laboratory is interested in collimation studies for LINAC4/SPL beams. ASTeC (RAL) could be a good partner of synchrotron beam dynamics (also PS2). Once the MoU is signed by both sides, single subjects will be added as "Addenda".
  • The status of FP7 funding was summarised in the recent meeting of the SPL study group.

2. Cost optimisation (W. Weingarten)

3. Beam loading and power consumption (F. Gerigk)

4. Round table

5. Next meeting

to be announced

next general SPL meeting September, 10th 2008, 9:00 in 6-2-004

-- FrankGerigk - 14 Jul 2008

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2008-07-14 - unknown
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright