1. General news and facts
2. SPL collaboration meeting
3. New Actions
4. Next meeting
5. Comments to the minutes

1. General news and facts

  • RG reported on a meeting with civil engineering (M. Poehler, L-A. Lopez-Hernandez), where a provisional planning for the construction of SPL and PS2 was discussed. The current planning foresees a start of the integration studies at January 09, a frozen integration at the end of the 3d quarter of 2009 and a frozen civil engineering design for the end of the 3d quarter 2010. A cost estimate would be ready in the middle of 2011 and construction can start in January 2012. The delivery of the buildings and infrastructure is then foreseen for the middle of 2016. Assuming a further 2 years for installation and commissioning brings the start of operation to 2018, which is still acceptable. It is clear however, that this schedule can only be kept if there are enough resources to push the machine and infrastructure design to a level that allows the integration work to proceed. Otherwise one has to take large safety margins on the infrastructure design, which would increase the cost estimate and delay the start of operation to a date, which is not compatible with the lifetime of LHC. RG will continue to inform department heads, and nominate someone to deal with the environmental impact study, land procurement, local communes, etc.
  • CEA will continue their HIPPI work within the frame of FP7, the work on cavities (2 beta=1, and one b=0.65) and couplers is within the CNI-PP and the design and construction of a cryo-module comes as a French in-kind contribution.

2. SPL collaboration meeting

  • a package on beam dynamics was added and the packages on cavity design and cavity construction where merged,
  • the package splitting of the workshop can be changed for the collaboration itself,
  • for the meeting we proceed with 2 chairs per package, one from CERN (who leads) and a second one from an institute, which will do a large fraction of the work, the preliminary proposal is:
    • high-power RF: Ciapala/Carter (Lancaster University UK),
    • Cavity design: Weingarten/Chel (CEA, France),
    • cryo-modules: Parma/ IN2P3,
    • beam dynamics: Gerigk or Lombardi/R. Baartman,
  • during the meeting we should discuss:
    • where the electropolishing for additional cavities is done, if we manage to order more cavities than foreseen in the CNI-PP (see above),
    • discussion on HOMs, it seems the Ilan Ben-Zvi uses ferrites instead of couplers, we need to understand the details,
  • we need to define detailed descriptions of the work packages. A first description was made for the collaboration with the Cockroft institute on the RF distribution network.

3. New Actions

Assigned to Start date Description State Result
FrankGerigk 2008-10-17 edit

4. Next meeting

to be defined

5. Comments

-- FrankGerigk - 04 Nov 2008

Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2008-11-04 - unknown
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright