100 Recent Changes in SPL Web retrieved at 15:49 (GMT)

Statistics for SPL Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top viewers: Top contributors for...
SPL Web project information meetings links SPL parameter list SPL study group Accelerators for the Future (PAF) Design Report (...
SPL Documentation goto Linac4 Documentation 2014 Conference papers RF Coupler Cooling Efficiency , R. Bonomi, C. Capatina, E. Montesinos, V. Parma,...
Welcome to the 1 Wiki These pages contain all information related to the new proton injector linacs, which form part of the upgrade of the CERN proton injector...
Minutes of RF structure meetings 2014 19 Jun 14 Linac4 operations Linac4 tuner (N. Shafqat) bead pull and tuning (M. Khalvati) 19 Jun 14 Multipacting...
Summary of the Collaboration Meeting at CERN, 22 August 2013 Participant Institute Responsibility Email Pawel Krawczyk NCBJ general manager Pawel.Krawczyk...
Meetings with the Soltan Institute for Nuclear Physics, Swierk, Poland, and Forschungszentrum J...
Photos JPG: JPG: JPG: JPG: JPG: JPG: JPG: JPG:
Linac4 3 MeV Test Stand technical information meetings planning Layout minutes, technical coordination Planning Infrastructure...
Summary of the Collaboration Meeting at NCBJ, 14 15 May 2013 Participant Institute Responsibility Email Pawel Krawczyk NCBJ general manager Pawel.Krawczyk...
Linac4 operations meeting, 16. May 2013
Linac4 Documentation goto SPL Documentation 2013 Notes Transverse and Longitudinal Acceptance Studies , V. Dimov, A. Lombardi, CERN ATS Note...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Tomoko Muranaka, Suitbert Ramberger, Rolf Wegner CCDTL (F. Gerigk) module 4: one HC joint not yet leak tight...
Beam dynamics for Linac4 LINAC4 Diagram Each section is designed and optimized as stand alone machines for a good transmission and minimum emittance growth. End...
Summary of the Collaboration Meeting at CERN, 26 27 February 2013 Participant Institute Responsibility Email Pawel Krawczyk NCBJ general manager Pawel...
RolfWegner 26 Feb 2013
Planning of Assembly, Testing, and Installation for Linac4 accelerating structures status: 9 Jan 2013 status: 21 Feb 13.pdf
Frank Gerigk, Mohammad Reza Khalvati, Tomoko Muranaka, Rolf Wegner CECOM (F. Gerigk) waiting for new samples (without oxidation) and proposal for a date to...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Jean Michel Giguet, Suitbert Ramberger, Rolf Wegner SM18 (F. Gerigk) The Indian modulator is repaired but needs...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Mohammad Reza Khalvati, Tomoko Muranaka, Rolf Wegner RFQ (F. Gerigk, J. Balula) measurements on tuning should...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Jean Michel Giguet, Mohammad Reza Khalvati, Tomoko Muranaka, Suitbert Ramberger, Rolf Wegner planning (F. Gerigk...
Accelerating structures for Linac4 with lengths of all accelerating structures waveguide positions codes CcdtlWeb CCDTL PIMS movable tuners...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Jean Michel Giguet, Mohammad Reza Khalvati, Rolf Wegner CCDTL (F. Gerigk) assembly start foreseen for 4. February...
CCDTL 8th technical meeting for production of 7 CCDTL modules for Linac4 (ISTC contract #3888 and #3889), 3 4 December 2012 at BINP Participants: BINP Novosibirsk...
ISTC collaboration meetings December3CCDTL (BINP, 3 4 December 2012): 9th technical meeting for contract #3888 and #3889 June18CCDTL (BINP, 18 21 June...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Mohammad Reza Khalvati, Tomoko Muranaka, Suitbert Ramberger, Rolf Wegner CCDTL (F. Gerigk) after recent meeting...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Rolf Wegner movable tuners (F. Gerigk) cleaning samples have been prepared by M. Taborelli and a small quantity...
SPL parameter table link to the Linac4 ParameterTable General linac parameters Parameters for the different modes of operation of cavities, cryo modules, length of...
Jose Marques Balula, Frank Gerigk, Jean Michel Giguet, Mohammad Reza Khalvati, Tomoko Muranaka, Suitbert Ramberger, Rolf Wegner CCDTL (F. Gerigk) JM: vacuum...
Jose Marques Balula, Frank Gerigk, Jean Michel Giguet, Mohammad Reza Khalvati, Rolf Wegner CCDTL (F. Gerigk) one module prepared for bead pull and high power...
Frank Gerigk, Jean Michel Giguet, Mohammad Reza Khalvati, Tomoko Muranaka, Suitbert Ramberger, Karl Martin Schirm, Rolf Wegner CCDTL (F. Gerigk) First 2 CCDTL...
of CCDTL prototypes reports of ISTC project 3889 (restricted access) Vacuum tests test procedure for CCDTL modules FrankGerigk 03 Feb 2009
Cavity Design working group How to edit this page: register here and send a mail with your TWIKI name to frank.gerigk #64;cernNOSPAMPLEASE.ch asking for access to...
Yves Cuvet, Frank Gerigk, Jean Michel Giguet, Tomoko Muranaka, Suitbert Ramberger, Rolf Wegner CCDTL (F. Gerigk) First 2 CCDTL cavites arrived at CERN, preparations...
CCDTL 8th technical meeting for production of 7 CCDTL modules for Linac4 (ISTC contract #3888 and #3889), 18 21 June 2012 at BINP Participants: BINP Novosibirsk...
Frank Gerigk, Jean Michel Giguet, Rolf Wegner Jacks (F. Gerigk) dimensions of Neff jacks were verified by JM, waiting for new drawings from Benoit, DTL...
Gerigk, Jean Michel Giguet, Kai Papke, Suitbert Ramberger, Karl Martin Schirm, Rolf Wegner India (F. Gerigk) we need to order quickly the material for the...
. RolfWegner 29 Jun 2012
. RolfWegner 28 Jun 2012
Y. Cuvet, F. Gerigk, J M. Giguet, R. Wegner, P. Ugena Tirado Helicoflex (J M. Giguet) double traces are usually a sign of over compression, it is possible...
Summary of Visit to NCBJ on 23 24 April 2012 and follow up Participant Institute Responsibility Email Pawel Krawczyk NCBJ general manager...
Y. Cuvet, F. Gerigk, J M. Giguet, K. Schirm, R. Wegner Other (F. Gerigk) Linac4 activities entered into LS1 planning tool CCDTL (F. Gerigk) all 3 half...
RolfWegner 11 May 2012
Y. Cuvet, F. Gerigk, J M. Giguet, S. Ramberger, K. Schirm, R. Wegner RFQ tuning (F. Gerigk) during a meeting yesterday we agreed on a schedule with Carlo,...
Y. Cuvet, F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado Safety file (F. Gerigk) Funken asked for drawings, layouts...
The Linac4 project project information meetings technical information seminar on Linac4 (22 Nov 2007) Linac4 Project meetings RF system...
Y. Cuvet, F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, R. Wegner, P. Ugena Tirado Safety (F. Gerigk) meeting with Anne Funken on Friday: update of...
F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, R. Wegner, P. Ugena Tirado BINP shipping (F. Gerigk) shipping has not yet left CERN for administrative...
Summary of Visit to the Polish National Centre for Nuclear Research (Narodowe Centrum Bada #324; J #261;drowych NCBJ) from 13th to 14th December 2011 Participant...
Summary of Visit to CERN on 2nd March 2012 Participant Institute Responsibility Email Marcin Wojciechowski NCBJ project coordination m.wojciechowski@ncbj...
Y. Cuvet, F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, R. Wegner, P. Ugena Tirado BINP shipping (F. Gerigk) BINP and CERN transport departments are...
Y. Cuvet, F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado IEFC meeting (F. Gerigk) there are some signs that Linac...
Y. Cuvet, F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) the first 2 support frames have been welded at...
Y. Cuvet, F. Gerigk, J M. Giguet, K. Schirm, R. Wegner, P. Ugena Tirado Jacks (F. Gerigk) deadline for decision on contract with Spain is the end of February...
Y. Cuvet, F. Gerigk, J M. Giguet, G. T. Papadaki, K. Schirm, R. Wegner, P. Ugena Tirado Jacks (F. Gerigk) most likely to be done in Spain Suitbert will...
F. Gerigk, J M. Giguet, G. T. Papadaki, K. Schirm, R. Wegner, P. Ugena Tirado updated Linac4 master plan (F. Gerigk) L4 masterplan 12 15.pdf: Linac4 Masterplan...
F. Gerigk, J M. Giguet, G. T. Papadaki, K. Schirm, R. Wegner, P. Ugena Tirado General news, water and air temperature in Linac4 tunnel (F. Gerigk) The cooling...
F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado General news The cooling water temperature for Linac4 will be...
Upgrade to high duty cycle This page contains a list of items that need to be changed/modified, when Linac4 is upgraded to high duty cycle to act as a front end for...
Summary of Visit of CPL and IPJ from 7th to 8rh April 2011: Participant Institute Function Pawel Krawczyk IPJ general manager Marcin Wojciechowski IPJ...
CCDTL 7th technical meeting for production of 7 CCDTL modules for Linac4 (ISTC contract #3888 and #3889), 6 11 November 2011 at BINP Participants: BINP Novosibirsk...
F. Gerigk, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado Movable Tuners (F. Gerigk) finance will conduct a price enquiry among different...
F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) truck to Russia being loaded today, report...
CCDTL 4th technical meeting for production of 7 CCDTL modules for Linac4 (ISTC contract #3888 and #3889), 15 17 June 2010 at CERN Participants: BINP Novosibirsk...
PIMS collaboration kick off meeting, 16 17 November 2010 at CERN Participants: Soltan Institute for Nuclear Studies (IPJ): Jan KOPEC (Head of production unit...
F. Gerigk, J M. Giguet, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) a contract addendum was signed for the material delivery for...
F. Gerigk, J M. Giguet, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado General News (F. Gerigk) LS1 will start November 2012 for 20 months for the LHC...
F. Gerigk, J M. Giguet, K. Schirm, R. Wegner DTL tank segments (F. Gerigk) construction schedule now 10 months delayed and a cost increase is claimed, discussion...
F. Gerigk, J M. Giguet, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado Linac4 (F. Gerigk) reliability run 2nd half of 2014, ready for connection end of...
F. Gerigk, J M. Giguet, K. Schirm, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) visit date is shifted to week starting with November 7th, probably flying out...
F. Gerigk, J M. Giguet, S. Ramberger, K. Schirm, R. Wegner CCDTL (F. Gerigk) received green light to ship pumping equipment, Alexey asked today for the shipping...
F. Gerigk, S. Ramberger, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) Alexey on holidays until end of August, delivery of pumping equipment to BINP is...
Minutes of an interlock meeting held on 22nd of July 2011 Present: A. Butterworth, G. Hagmann, L. Arnaudon, B. Puccio, I. Kozsar, J L. Sanchez, B. Mikulec. 1. Chopper...
Minutes of the Booster Commissioning Working Group Meetings 2010 Minutes 2011 Minutes 04 February Integration Dump/LBE/LBS Lines 14 March PSB Fluka...
F. Gerigk, K. Schirm, R. Wegner CCDTL (F. Gerigk) For the transfer of funds from ISTC projects 2888 and 2889 to 3888 and 3889, M. Vretenar is asked to write...
Linac4 Parameter Table shortcuts to General linac parameters, Error amplitudes, Beam evolution, Ion source and LEBT, RFQ, MEBT, DTL, CCDTL, PIMS, Transfer line, PSB...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) there is money left in ISTC projects 2888 and 2889. Since the participants...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) technical specs for support in preparation, should soon receive material...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner India (F. Gerigk) Couplers: CERN accepted multi layer TIG welds, which are applied to an X type groove. This...
Equipment codes: cold model: ACPMA hot model: ACPMB tooling: ACPMT Technical Information on the PIMS: construction experience of PIMS cavities...
F. Gerigk, S. Ramberger, R. Wegner, P. Ugena Tirado (F. Gerigk) India (F. Gerigk) Monday morning at 9:30, video conference with India on further collaboration...
Jacks and wave guide couplers for Linac4, meeting 8/9 March 2011 at RRCAT, Indore, India 1. Introductory presentation by F. Gerigk 2. Jacks 3. Wave guide coupler...
CCDTL 6th technical meeting for production of 7 CCDTL modules for Linac4 (ISTC contract #3888 and #3889), 1 3 March 2011 at BINP Participants: BINP Novosibirsk...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado Survey/alignment (F. Gerigk) During a discussion with M. Jones and A. Dallocchio the remaining...
F. Gerigk, S. Ramberger, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) yesterday was a video conference with BINP on the construction of the CCDTL support,...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) a Memo has been submitted to justify a direct contract with BINP for the construction...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado Project X collaboration meeting (F. Gerigk) meeting took place April 12 14 at SNS: https://indico...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado Linac4 windows (F. Gerigk) phone conference with Edmond on Monday afternoon, Thales still very...
Minutes of the Booster Commissioning Working Group held on 14th of March 2011 Present: S. Damjanovic, A. Newborough, A. Lombardi, L. Hein, T. Hermanns, K. Hanke...
Minutes of the Booster Commissioning Working Group held on 18th of November 2010 Present: G. Bellodi, J. Borburgh, C. Carli, K. Hanke, L. Hein, T. Hermanns, A. Lombardi...
Minutes of the joint meeting Booster Commissioning and PSB Beam Dynamics with Linac4 Working Groups held on 17th of September 2009 Present: A. Lombardi, C. Carli...
Minutes of the Booster Commissioning Working Group held on 8th of January 2009 Present: W. Weterings, J. Borburgh, C. DeAlmeida Martins, Y. Kadi, C. Carli, T. Hermanns...
Meeting on Debuncher Cavity 24. March 2011 present: A.K. Bhattacharyya, H. Broere, C. Carli, F. Gerigk, L.M. Hein, W. Hoefle, A. Lombardi, J. Tuckmantel, M. Vretenar...
General meetings on accelerating structures (across work packages) 24 Mar 2011 Debuncher cavity 22 Feb 2011 Equipping waveguide Ts with movable tuner...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado water connections (F. Gerigk) meeting on Monday with J P. Corso to discuss positions of water...
F. Gerigk, K. Schirm, R. Wegner, P. Ugena Tirado General: RF Structure Meeting The character of the meeting will change from RF development towards production...
Collaboration meetings with RRCAT, India 8/9 March 2011, during CERN/INDIA meeting: definition of pieces and first discussion FrankGerigk 22 Mar 2011
Number of topics: 100

Show recent changes with 50, 100, 200, 500, 1000 topics, all changes

Related topics: RSS feed, rounded corners RSS feed, ATOM feed, WebNotify, site changes, site map

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2006-11-15 - TWikiContributor
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright