500 Recent Changes in SPL Web retrieved at 18:47 (GMT)

Statistics for SPL Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top viewers: Top contributors for...
SPL Web project information meetings links SPL parameter list SPL study group Accelerators for the Future (PAF) Design Report (...
SPL Documentation goto Linac4 Documentation 2014 Conference papers RF Coupler Cooling Efficiency , R. Bonomi, C. Capatina, E. Montesinos, V. Parma,...
Welcome to the 1 Wiki These pages contain all information related to the new proton injector linacs, which form part of the upgrade of the CERN proton injector...
Minutes of RF structure meetings 2014 19 Jun 14 Linac4 operations Linac4 tuner (N. Shafqat) bead pull and tuning (M. Khalvati) 19 Jun 14 Multipacting...
Summary of the Collaboration Meeting at CERN, 22 August 2013 Participant Institute Responsibility Email Pawel Krawczyk NCBJ general manager Pawel.Krawczyk...
Meetings with the Soltan Institute for Nuclear Physics, Swierk, Poland, and Forschungszentrum J...
Photos JPG: JPG: JPG: JPG: JPG: JPG: JPG: JPG:
Linac4 3 MeV Test Stand technical information meetings planning Layout minutes, technical coordination Planning Infrastructure...
Summary of the Collaboration Meeting at NCBJ, 14 15 May 2013 Participant Institute Responsibility Email Pawel Krawczyk NCBJ general manager Pawel.Krawczyk...
Linac4 operations meeting, 16. May 2013
Linac4 Documentation goto SPL Documentation 2013 Notes Transverse and Longitudinal Acceptance Studies , V. Dimov, A. Lombardi, CERN ATS Note...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Tomoko Muranaka, Suitbert Ramberger, Rolf Wegner CCDTL (F. Gerigk) module 4: one HC joint not yet leak tight...
Beam dynamics for Linac4 LINAC4 Diagram Each section is designed and optimized as stand alone machines for a good transmission and minimum emittance growth. End...
Summary of the Collaboration Meeting at CERN, 26 27 February 2013 Participant Institute Responsibility Email Pawel Krawczyk NCBJ general manager Pawel...
RolfWegner 26 Feb 2013
Planning of Assembly, Testing, and Installation for Linac4 accelerating structures status: 9 Jan 2013 status: 21 Feb 13.pdf
Frank Gerigk, Mohammad Reza Khalvati, Tomoko Muranaka, Rolf Wegner CECOM (F. Gerigk) waiting for new samples (without oxidation) and proposal for a date to...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Jean Michel Giguet, Suitbert Ramberger, Rolf Wegner SM18 (F. Gerigk) The Indian modulator is repaired but needs...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Mohammad Reza Khalvati, Tomoko Muranaka, Rolf Wegner RFQ (F. Gerigk, J. Balula) measurements on tuning should...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Jean Michel Giguet, Mohammad Reza Khalvati, Tomoko Muranaka, Suitbert Ramberger, Rolf Wegner planning (F. Gerigk...
Accelerating structures for Linac4 with lengths of all accelerating structures waveguide positions codes CcdtlWeb CCDTL PIMS movable tuners...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Jean Michel Giguet, Mohammad Reza Khalvati, Rolf Wegner CCDTL (F. Gerigk) assembly start foreseen for 4. February...
CCDTL 8th technical meeting for production of 7 CCDTL modules for Linac4 (ISTC contract #3888 and #3889), 3 4 December 2012 at BINP Participants: BINP Novosibirsk...
ISTC collaboration meetings December3CCDTL (BINP, 3 4 December 2012): 9th technical meeting for contract #3888 and #3889 June18CCDTL (BINP, 18 21 June...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Mohammad Reza Khalvati, Tomoko Muranaka, Suitbert Ramberger, Rolf Wegner CCDTL (F. Gerigk) after recent meeting...
Jose Marques Balula, Yves Cuvet, Frank Gerigk, Rolf Wegner movable tuners (F. Gerigk) cleaning samples have been prepared by M. Taborelli and a small quantity...
SPL parameter table link to the Linac4 ParameterTable General linac parameters Parameters for the different modes of operation of cavities, cryo modules, length of...
Jose Marques Balula, Frank Gerigk, Jean Michel Giguet, Mohammad Reza Khalvati, Tomoko Muranaka, Suitbert Ramberger, Rolf Wegner CCDTL (F. Gerigk) JM: vacuum...
Jose Marques Balula, Frank Gerigk, Jean Michel Giguet, Mohammad Reza Khalvati, Rolf Wegner CCDTL (F. Gerigk) one module prepared for bead pull and high power...
Frank Gerigk, Jean Michel Giguet, Mohammad Reza Khalvati, Tomoko Muranaka, Suitbert Ramberger, Karl Martin Schirm, Rolf Wegner CCDTL (F. Gerigk) First 2 CCDTL...
of CCDTL prototypes reports of ISTC project 3889 (restricted access) Vacuum tests test procedure for CCDTL modules FrankGerigk 03 Feb 2009
Cavity Design working group How to edit this page: register here and send a mail with your TWIKI name to frank.gerigk #64;cernNOSPAMPLEASE.ch asking for access to...
Yves Cuvet, Frank Gerigk, Jean Michel Giguet, Tomoko Muranaka, Suitbert Ramberger, Rolf Wegner CCDTL (F. Gerigk) First 2 CCDTL cavites arrived at CERN, preparations...
CCDTL 8th technical meeting for production of 7 CCDTL modules for Linac4 (ISTC contract #3888 and #3889), 18 21 June 2012 at BINP Participants: BINP Novosibirsk...
Frank Gerigk, Jean Michel Giguet, Rolf Wegner Jacks (F. Gerigk) dimensions of Neff jacks were verified by JM, waiting for new drawings from Benoit, DTL...
Gerigk, Jean Michel Giguet, Kai Papke, Suitbert Ramberger, Karl Martin Schirm, Rolf Wegner India (F. Gerigk) we need to order quickly the material for the...
. RolfWegner 29 Jun 2012
. RolfWegner 28 Jun 2012
Y. Cuvet, F. Gerigk, J M. Giguet, R. Wegner, P. Ugena Tirado Helicoflex (J M. Giguet) double traces are usually a sign of over compression, it is possible...
Summary of Visit to NCBJ on 23 24 April 2012 and follow up Participant Institute Responsibility Email Pawel Krawczyk NCBJ general manager...
Y. Cuvet, F. Gerigk, J M. Giguet, K. Schirm, R. Wegner Other (F. Gerigk) Linac4 activities entered into LS1 planning tool CCDTL (F. Gerigk) all 3 half...
RolfWegner 11 May 2012
Y. Cuvet, F. Gerigk, J M. Giguet, S. Ramberger, K. Schirm, R. Wegner RFQ tuning (F. Gerigk) during a meeting yesterday we agreed on a schedule with Carlo,...
Y. Cuvet, F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado Safety file (F. Gerigk) Funken asked for drawings, layouts...
The Linac4 project project information meetings technical information seminar on Linac4 (22 Nov 2007) Linac4 Project meetings RF system...
Y. Cuvet, F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, R. Wegner, P. Ugena Tirado Safety (F. Gerigk) meeting with Anne Funken on Friday: update of...
F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, R. Wegner, P. Ugena Tirado BINP shipping (F. Gerigk) shipping has not yet left CERN for administrative...
Summary of Visit to the Polish National Centre for Nuclear Research (Narodowe Centrum Bada #324; J #261;drowych NCBJ) from 13th to 14th December 2011 Participant...
Summary of Visit to CERN on 2nd March 2012 Participant Institute Responsibility Email Marcin Wojciechowski NCBJ project coordination m.wojciechowski@ncbj...
Y. Cuvet, F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, R. Wegner, P. Ugena Tirado BINP shipping (F. Gerigk) BINP and CERN transport departments are...
Y. Cuvet, F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado IEFC meeting (F. Gerigk) there are some signs that Linac...
Y. Cuvet, F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) the first 2 support frames have been welded at...
Y. Cuvet, F. Gerigk, J M. Giguet, K. Schirm, R. Wegner, P. Ugena Tirado Jacks (F. Gerigk) deadline for decision on contract with Spain is the end of February...
Y. Cuvet, F. Gerigk, J M. Giguet, G. T. Papadaki, K. Schirm, R. Wegner, P. Ugena Tirado Jacks (F. Gerigk) most likely to be done in Spain Suitbert will...
F. Gerigk, J M. Giguet, G. T. Papadaki, K. Schirm, R. Wegner, P. Ugena Tirado updated Linac4 master plan (F. Gerigk) L4 masterplan 12 15.pdf: Linac4 Masterplan...
F. Gerigk, J M. Giguet, G. T. Papadaki, K. Schirm, R. Wegner, P. Ugena Tirado General news, water and air temperature in Linac4 tunnel (F. Gerigk) The cooling...
F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado General news The cooling water temperature for Linac4 will be...
Upgrade to high duty cycle This page contains a list of items that need to be changed/modified, when Linac4 is upgraded to high duty cycle to act as a front end for...
Summary of Visit of CPL and IPJ from 7th to 8rh April 2011: Participant Institute Function Pawel Krawczyk IPJ general manager Marcin Wojciechowski IPJ...
CCDTL 7th technical meeting for production of 7 CCDTL modules for Linac4 (ISTC contract #3888 and #3889), 6 11 November 2011 at BINP Participants: BINP Novosibirsk...
F. Gerigk, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado Movable Tuners (F. Gerigk) finance will conduct a price enquiry among different...
F. Gerigk, J M. Giguet, G. T. Papadaki, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) truck to Russia being loaded today, report...
CCDTL 4th technical meeting for production of 7 CCDTL modules for Linac4 (ISTC contract #3888 and #3889), 15 17 June 2010 at CERN Participants: BINP Novosibirsk...
PIMS collaboration kick off meeting, 16 17 November 2010 at CERN Participants: Soltan Institute for Nuclear Studies (IPJ): Jan KOPEC (Head of production unit...
F. Gerigk, J M. Giguet, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) a contract addendum was signed for the material delivery for...
F. Gerigk, J M. Giguet, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado General News (F. Gerigk) LS1 will start November 2012 for 20 months for the LHC...
F. Gerigk, J M. Giguet, K. Schirm, R. Wegner DTL tank segments (F. Gerigk) construction schedule now 10 months delayed and a cost increase is claimed, discussion...
F. Gerigk, J M. Giguet, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado Linac4 (F. Gerigk) reliability run 2nd half of 2014, ready for connection end of...
F. Gerigk, J M. Giguet, K. Schirm, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) visit date is shifted to week starting with November 7th, probably flying out...
F. Gerigk, J M. Giguet, S. Ramberger, K. Schirm, R. Wegner CCDTL (F. Gerigk) received green light to ship pumping equipment, Alexey asked today for the shipping...
F. Gerigk, S. Ramberger, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) Alexey on holidays until end of August, delivery of pumping equipment to BINP is...
Minutes of an interlock meeting held on 22nd of July 2011 Present: A. Butterworth, G. Hagmann, L. Arnaudon, B. Puccio, I. Kozsar, J L. Sanchez, B. Mikulec. 1. Chopper...
Minutes of the Booster Commissioning Working Group Meetings 2010 Minutes 2011 Minutes 04 February Integration Dump/LBE/LBS Lines 14 March PSB Fluka...
F. Gerigk, K. Schirm, R. Wegner CCDTL (F. Gerigk) For the transfer of funds from ISTC projects 2888 and 2889 to 3888 and 3889, M. Vretenar is asked to write...
Linac4 Parameter Table shortcuts to General linac parameters, Error amplitudes, Beam evolution, Ion source and LEBT, RFQ, MEBT, DTL, CCDTL, PIMS, Transfer line, PSB...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) there is money left in ISTC projects 2888 and 2889. Since the participants...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) technical specs for support in preparation, should soon receive material...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner India (F. Gerigk) Couplers: CERN accepted multi layer TIG welds, which are applied to an X type groove. This...
Equipment codes: cold model: ACPMA hot model: ACPMB tooling: ACPMT Technical Information on the PIMS: construction experience of PIMS cavities...
F. Gerigk, S. Ramberger, R. Wegner, P. Ugena Tirado (F. Gerigk) India (F. Gerigk) Monday morning at 9:30, video conference with India on further collaboration...
Jacks and wave guide couplers for Linac4, meeting 8/9 March 2011 at RRCAT, Indore, India 1. Introductory presentation by F. Gerigk 2. Jacks 3. Wave guide coupler...
CCDTL 6th technical meeting for production of 7 CCDTL modules for Linac4 (ISTC contract #3888 and #3889), 1 3 March 2011 at BINP Participants: BINP Novosibirsk...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado Survey/alignment (F. Gerigk) During a discussion with M. Jones and A. Dallocchio the remaining...
F. Gerigk, S. Ramberger, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) yesterday was a video conference with BINP on the construction of the CCDTL support,...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado CCDTL (F. Gerigk) a Memo has been submitted to justify a direct contract with BINP for the construction...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado Project X collaboration meeting (F. Gerigk) meeting took place April 12 14 at SNS: https://indico...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado Linac4 windows (F. Gerigk) phone conference with Edmond on Monday afternoon, Thales still very...
Minutes of the Booster Commissioning Working Group held on 14th of March 2011 Present: S. Damjanovic, A. Newborough, A. Lombardi, L. Hein, T. Hermanns, K. Hanke...
Minutes of the Booster Commissioning Working Group held on 18th of November 2010 Present: G. Bellodi, J. Borburgh, C. Carli, K. Hanke, L. Hein, T. Hermanns, A. Lombardi...
Minutes of the joint meeting Booster Commissioning and PSB Beam Dynamics with Linac4 Working Groups held on 17th of September 2009 Present: A. Lombardi, C. Carli...
Minutes of the Booster Commissioning Working Group held on 8th of January 2009 Present: W. Weterings, J. Borburgh, C. DeAlmeida Martins, Y. Kadi, C. Carli, T. Hermanns...
Meeting on Debuncher Cavity 24. March 2011 present: A.K. Bhattacharyya, H. Broere, C. Carli, F. Gerigk, L.M. Hein, W. Hoefle, A. Lombardi, J. Tuckmantel, M. Vretenar...
General meetings on accelerating structures (across work packages) 24 Mar 2011 Debuncher cavity 22 Feb 2011 Equipping waveguide Ts with movable tuner...
F. Gerigk, S. Ramberger, K. Schirm, R. Wegner, P. Ugena Tirado water connections (F. Gerigk) meeting on Monday with J P. Corso to discuss positions of water...
F. Gerigk, K. Schirm, R. Wegner, P. Ugena Tirado General: RF Structure Meeting The character of the meeting will change from RF development towards production...
Collaboration meetings with RRCAT, India 8/9 March 2011, during CERN/INDIA meeting: definition of pieces and first discussion FrankGerigk 22 Mar 2011
Minutes of Collaboration Meetings JPARC Hippi meetings, meetings of the HIPPI collaboration ISTC collaboration meetings, construction of DTL, CCDTL...
22.02.2011 Deformations of waveguide ring during brazing The shape of the ring does not matter, the average radius / diameter is the important quantity. The...
Summary : using 3 CCDTL type tuners, diameter 83 mm of the piston, flange: DN100 RF simulations, rough idea, to be verified: beta range ~ 0.95 (penetration...
F. Gerigk, S. Ramberger, R. Wegner, P. Tirado, M. Schuh Linac4 Planed to have beam in Booster from Linac4 in June 2013 Window tendering: only a offer from...
PIMS collaboration: 2nd technical meeting, 13 December 2010 at CERN Participants: Soltan Institute for Nuclear Studies (IPJ): Grzegorz BRZEZINSKI (responsible...
F. Gerigk, P. Tirado, M. Schuh Linac4 Planned to be connected to the PSB in the next long shutdown 2013/14. PIMS WG Tuner simulations with cavity...
F. Gerigk, S. Ramberger, R. Wegner, P. Tirado, M. Schuh SPL SPL prototype cavity production delayed by 5 month see SPL Cavity WG meeting (http://indico.cern...
F. Gerigk, R. Wegner, P. Tirado, M. Schuh Linac4 Tendering for RF Windows started Solid state amplifier for buncher cavities tested successfully Source...
F. Gerigk, S. Ramberger, R. Wegner, P. Tirado, M. Schuh SPL TRIUMF left collaboration Turkey likes to join SPL R D PIMS Collaboration agreement...
CCDTL 5th technical meeting for production of 7 CCDTL modules for Linac4 (ISTC contract #3888 and #3889), 20 21 July 2010 at VNIITF Participants: BINP Novosibirsk...
F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado, M. Schuh General Inter tank meeting for Linac4 Bulletin article of PIMS test (Link...
HOM working group How to edit this page: register here and send a mail with your TWIKI name to frank.gerigk #64;cernNOSPAMPLEASE.ch asking for access to the `SPL...
Minutes of the Booster Commissioning Working Group held on 12th of June 2009 Present: W. Weterings, J. Borburgh, G. Bellodi, S. Maury, M. Struik, B. Goddard, D....
F. Gerigk, R. Wegner, G. DeMichele , P. Tirado, M. Schuh CCDTL Shipping of first module again delayed. New date is 6.Dec. Delivering date for...
Minutes of the joint meeting Booster Commissioning and PSB Beam Dynamics with Linac4 Working Groups held on 1st of October 2009 Present: A. Lombardi, C. Carli, W...
Interlock minutes of a meeting held on 7th of December 2009 Present: B. Puccio, K. Hanke, J L. Sanchez, J C. Bau, R. Scrivens, M. Paoluzzi, B. Mikulec. Agenda:...
Minutes of the Booster Commissioning Working Group held on 11th of March 2010 Present: G. Bellodi, V. Boccone, C. Carli, R. Chamizo, J M. Cravero, F. Formenti, K...
F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado, M. Schuh General Waveguide window specification prepared to be reviewed by sLHC Spec. Board...
F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado, M. Schuh General Meeting on installing of L4 RF structures: DTL commissioning in...
F. Gerigk, R. Wegner, G. DeMichele , P. Tirado, M. Schuh General 5th SPL collaboration meeting 25. 26.11.2010. Indico Collaboration with INFN for...
F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado General Finance committee agreement to negotiate with Polland and Germany without tender...
Minutes of an interlock meeting held on 30th of September 2010 Agenda: 1. Proposal for a beam interlock system for Linac4 and PSB (B. Mikulec) 1. Related discussions...
PIMS construction 6 September 2010 Pr...
PIMS construction 5 July 2010 Pr...
Meeting on Debuncher Cavity 9. July 2010 present: A.K. Bhattacharyya, P. Baudrenghien, F. Gerigk, L.M. Hein, W. Hoefle, A. Lombardi, J. Tuckmantel, R. Wegner, LLRF...
F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , and M. Schuh General Joint meetings with CLIC RF group in the future CCDTL Meeting at VNIITF...
Radiation Protection for PIMS prototype tests in the 3 MeV test stand, 23. July 2010 present: J. M. Giguet, Th. Otto, C. Rossi, R. Wegner, M. Widorski on layout...
F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado and M. Schuh SPL Status report of all involved labs at the SPL collaboration meeting together...
S. Ramberger, R. Wegner, and M. Schuh General Proposal for more common meetings with CLIC RF group Visit ADAM next week: Indico DTL Further simulations...
Location and Specifications for BLMs in the PSB Injection Region Present: R. Versaci, Ch. Zamantzas, B. Dehning, U. Raich, B. Goddard, Ch. Carli, A. Lombardi, K...
F. Gerigk, R. Wegner, G. DeMichele , P. Tirado and M. Schuh SPL R D budget of 3MCHF/year Next week SPL collaboration meeting together with ESS in...
PIMS construction 28. June 2010 Pr...
PIMS construction 21. June 2010 Pr...
CCDTL 3d technical meeting for production of 7 CCDTL modules for Linac4 (#3888, #3889), March 8 10, 2010 Participants: BINP, Novosibirsk: Alexey Tribendis...
F. Gerigk, R. Wegner , G.DeMichele DTL Prototype high power test Prototype with magnet in the first DT and anodizing matrix in the LE end cone conditioned...
PIMS Construction 14. June 2010 Pr...
Meeting on Debuncher Cavity 3. June 2010 present: A.K. Bhattacharyya, P. Baudrenghien, M. Vretenar, R. Wegner, C. Carli ZTT optimisation of debuncher cavity...
F. Gerigk, R. Wegner , G. DeMichele DTL Prototype high power test Prototype with magnets in the first DT and in the LE end cone conditioned at...
Support, alignment, integration and transport for PIMS modules, 31 May 2010 present: J. P. Corso, A. Dallocchio, F. Gerigk, J. L. Grenard, M. Jones, M. Vretenar...
PIMS construction 31 May 2010 Pr...
CCDTL: kick off meeting for production of 7 CCDTL modules for Linac4 (#3888, #3889), July 13 16, 2009 Participants: BINP, Novosibirsk: A. Tribendis, Y. Kryuchkov...
F. Gerigk, S. Ramberger, G. DeMichele , P. Tirado Linac4 accelerating structures high power test dedicated place in bld 150 and/or SM18 updating...
PIMS construction 17 May 2010 Pr...
PIMS Construction 12 May 2010 Pr...
Cryo modules Parameters (nominal and ultimate from cavities machine layout operation) Parameters Value1 Value2 Comment Timestamp quadrupole...
F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado and M. Schuh SPL cavity workgroup meeting with ESS Buncher cavity Simulation...
Meeting on Debuncher Cavity, 5. May 2010 present: A.K. Bhattacharyya, P. Baudrenghien, M. Vretenar, A. Lombardi, L.M. Hein, R. Wegner, J. Tuckmantel, R. Garoby, C...
Meeting on the Linac4 debuncher cavity, 4. April 2010 Action Plan within ~1 month Philippe should have a simulation model that gives us the power needs for the...
PIMS construction 26. April 2010 Pr...
F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado, M. Schuh, and R. De Prisco Linac4 Meeting: RF Distribution, structure RF tests...
Summary on Discussion on Screens for the Linac4 Dump Line and LBE Line Present: E. Bravin, T. Hermanns, B. Mikulec, U. Raich 1. Base Line The aim of this discussion...
Minutes of Diagnostics Working Group meetings Minutes28March2006 Minutes26January2007 Minutes14January2008 Minutes19January2009 Feschenko monitor...
PIMS Construction 19 April 2010 Pr...
F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado, M. Schuh, and R. De Prisco SPL Only small cryomodule (for 4 cavities) will be build...
F. Gerigk, S. Ramberger, G. DeMichele , P. Tirado, M. Schuh, and R. De Prisco Linac4 Time table Linac4 structure tests Received cost estimate...
PIMS Construction 13 April 2010 Pr...
PIMS construction 6. April 2010 Pr...
SPL dump FLUKA simulations present: R. Garoby, F. Gerigk, F. Haug, E. Lebbos, T. Otto Discussion items: E. Lebbos showed simulations on energy deoposition...
Various Technical meetings 27 Jan 2010 SPL dump FLUKA simulations 06 Apr 2010 SPL dump FLUKA simulations FrankGerigk 23 Mar 2010
PIMS Construction 29 March 2010 Pr...
F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado, M. Schuh, and R. De Prisco General THALES: New branch, offers integration works, possible...
CCDTL 2nd technical meeting for production of 7 CCDTL modules for Linac4 (#3888, #3889), October 26 28, 2009 Participants: BINP, Novosibirsk: A. Tribendis, Y....
PIMS Construction, 22 March 2010 Pr...
SPL dump FLUKA simulations, 27 January 2010 present: O. Aberle, R. Garoby, F. Gerigk, F. Haug, E. Lebbos, T. Otto, V. Vlachoudis Discussion items: E. Lebbos...
F. Gerigk, S. Ramberger, R. Wegner, G. DeMichele , P. Tirado Buncher Cavity A report of all damages has been sent back to Poland in order to define a quality...
Talks with relevance for the SPL more talks can be found in the minutes of the SPL study group 2010 Seminar S. Fu ADS activities in China 2008 2008,...
PIMS Construction, 15 March 2010 Pr...
Minutes of the Booster Commissioning Working Group held on 25th of February 2010 Present: K. Hanke, T. Hermanns, A. Newborough Agenda: 1. Communications...
Minutes of the Booster Commissioning Working Group held on 04th of February 2010 Present: O. Aberle, G. Bellodi, A. Dallocchio, C. Carli, R. Chamizo, J. Coupard...
Minutes of the Booster Commissioning Working Group held on 10th of April 2008 Present: K. Hanke, T. Zickler, C. Carli, C. De Almeida Martins, M. Eshraqi, J. Borburgh...
Minutes of the Booster Commissioning Working Group held on 22nd of November 2007 Present: S. Joffe, J M. Cravero, G. Simonet, C. De Almeida Martins, M. Eshraqi,...
PIMS construction, 1 March 2010 Pr...
F. Gerigk, S. Ramberger, G. DeMichele , M. Schuh, P. Tirado, and R. De Prisco DTL Drift tube production: first 2 welds done of the drift tube that...
PIMS construction, 22 February 2010, Pr...
PIMS construction, 16 February 2010, presents: T. Tardy / R. Wegner / M. Polini / A. Dallocchio / JM Geisser / L. Gentini Cavit...
PIMS construction, 9 February 2010, Pr...
F. Gerigk, S. Ramberger, G. DeMichele , R. De Prisco Buncher cavity the cavity arrived in Geneva (not yet in CERN) from Polland (shipment on 2nd February...
F. Gerigk, S. Ramberger, G. DeMichele , M. Schuh, P. Tirado, and R. De Prisco New Member introduced: R. De Prisco Renato will work on the automatic system...
PIMS construction minutes 1. February 2010 Pr...
Meeting summary on PIMS construction, CERN, 3d December 2009 present: W. Behr (FZJ), P. Bourquin, G. Favre, J M. Geisser, L. Gentini, F. Gerigk, J. Kopec (IPJ),...
Minutes of the Booster Commissioning Working Group held on 20th of March 2008 Present: K. Hanke, T. Zickler, C. Carli, C. De Almeida Martins, W. Weterings, B. Mikulec...
Minutes of meeting on PIMS construction 25 January 2010 Pr...
F. Gerigk, S. Ramberger, G. DeMichele , M. Schuh, and P. Tirado Linac4 Linac4 Project meeting (Indico) DTL Simulation of influence of power coupler...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 14 December 2009 Present: C. Carli, B. Goddard, U. Raich, J. Borburgh, B. Holzer, E. Effinger, C...
Minutes of meeting on PIMS construction 18 January 2010 Pr...
F. Gerigk, S. Ramberger, G. DeMichele , M. Schuh, and P. Tirado DTL Drift tube welding tests with alu dummy and real magnet were done. Results see:...
Minutes of meeting on PIMS construction 11 January 2010 Pr...
F. Gerigk, S. Ramberger, G. DeMichele and M.Schuh Buncher cavity Final tuning will be done at CERN DTL Delivery of the Bilbao drift tube for the...
Interlock minutes held on 30th of September 2009 Present: B. Puccio, B. Todd, J. Wenninger, K. Hanke, J L. Sanchez, J C. Bau, E. Piselli, I. Kozsar, D. Nisbet, G...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 17 November 2008 Present: U.Raich, J.Tan, G.Bellodi, A.Lokhovitskiy, M.Ludwig, A.Raimondo, C.Dutriat...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 4 February 2008 Present: E.Bravin, C.Dutriat, K.Hanke, T.Lefevre, R.Scrivens, E.Sargsyan, B.Dehning...
Minutes of meeting on PIMS construction 30 November 2009 Pr...
Minutes of meeting on PIMS construction 14 December 2009 Pr...
F. Gerigk, S. Ramberger, G. DeMichele , and P. Tirado DTL Analysis of DTL DF and DTL plot programs by J. Billen: the principle is useful and in same cases...
F. Gerigk, S. Ramberger, M. Schuh, and P. Tirado CCDTL Circuit model presented: Two full acc. cells and one coupling cells (PresentationCircuitalModel.pptx...
F. Gerigk, S. Ramberger, G. DeMichele , and P. Tirado DTL The new drift tube with the magnet will be mounted on the prototype at the end of Janaury....
Welding of ports on CERN PIMS prototype FrankGerigk 04 Dec 2009
Event Calendar events in: 2007, 2008 28 Jan 2008 29 Jan 2008 design review 8 Apr 2008 9 Apr 2008 kick off 30 Apr 2008 SPL review 23 Jun...
Minutes of meeting on PIMS construction 23 November 2009 Pr...
Beam Dump Reference positions for main dump elements Dump entry 10300 mm from Linac4 exit Dump core 11900 mm from Linac4 exit Beam sizes (1 RMS) for...
Beam Dump Reference positions for main dump elements Dump entry 15211 mm from entrance to LTB.BHZ40. Dump core 16811 mm from entrance to LTB.BHZ40....
This page is meant to summarizes important functional specifications on the three diagnostic lines as well as to collect the results of meetings and discussions after...
S. Ramberger, M. Schuh, G. DeMichele and P. Tirado CCDTL Circuit model amoust complete, losses still have to be included Detailed presentation next...
Minutes of meeting on PIMS construction 09 November 2009 Pr...
Minutes of meeting on PIMS construction 09 November 2009 Pr...
F. Gerigk, S. Ramberger, M. Schuh, G. DeMichele, P. Tirado, Jim Billen, und Jim Stovall Linac4 Meeting with company THALES: Windows for L4 (modified...
Minutes of meeting on PIMS construction 02 November 2009 Pr...
F. Gerigk, S. Ramberger, M. Schuh, P. Tirado CCDTL Technical meeting was a success. All open issues were discussed Shipping list is under preparation...
DTL prototype Tilt on the field J.Billen introduced a torus with triangular section on the DTs to simulate the effect of the stems. In order to have...
Minutes RF structure meeting on PIMS construction 19 October 2009 Pr...
LINAC4 Buncher cavity Soltan Institute will deliver the cavity around the middle of November (first estimate was June) Q measured 19200 without...
Minutes of the Booster Commissioning Working Group held on 30th of July 2009 Present: A. Lombardi, G. Bellodi, M. Vretenar, D. Nisbet, T. Zickler, R. Scrivens, U...
Minutes RF structure meeting on PIMS construction 12 October 2009 Pr...
Interlock minutes held on 29th of September 2009 Present: B. Goddard,...
F. Gerigk, S. Ramberger, G. DeMichele, M. Jarosz, J. Borkowski, P. Tirado LINAC4 Siemens experts will deliver a paper on the LINAC4 risks (first time...
S. Ramberger, G. DeMichele, M. Jarosz, J. Borkowski, P. Tirado DTL Copper made post couplers cut to the lengths found in the sensitivity measurement with...
our machine was studied and actually made at CERN in the 1980s. In 1996 PTR (a German company) installed an electron gun with 70 kV and 30 kW together with the corresponding...
August 2009 start of collaboration FrankGerigk 2009 09 14
F. Gerigk, S. Ramberger, M. Schuh, M. Jarosz, J. Borkowski, G. DeMichele, P. Tirado CCDTL pumping port calculations to increase the flux DTL temperature...
Support and alignment of Linac4 accelerating structures, 24 August 2009 Participants: P. Bourquin, Y. Cuvet, G. Favre, F. Gerigk, L. Gentini, M. Jones, J M. Lacroix...
F. Gerigk, S. Ramberger, G. DeMichele, M. Jarosz, J. Borkowski, General Meeting with support and alignments people to establish how to make the support...
xxx FrankGerigk 2009 08 24
F. Gerigk, S. Ramberger, M. Schuh, M. Jarosz, J. Borkowski, DTL Post couplers are delivered and tools are under preparation to shorten them Bead Pulling...
Figure 1: Frequency and ZTT change as a function of tuner penetration and frequency shift file FrankGerigk 2009 08 21
F. Gerigk, S. Ramberger, M. Schuh, M. Jarosz, J. Borkowski, G. DeMichele DTL After the vacuum test (1.2 10 6 mBar ) it is ready for bead pull measurements...
S. Ramberger, M. Schuh, M. Jarosz, J. Borkowski, N.Alharbi, G. DeMichele DTL Prototype: all drift tubes are installed, 3 with rubber biscuit, not 100%...
This is a subscription service to be automatically notified by e mail when topics change in this 1 web. This is a convenient service, so you do not have to come...
S. Ramberger, M. Schuh, M. Jarosz, J. Borkowski DTL Prototype: 4 more drift tubes installed without problems. Install further drift tubes and prepare for Bead...
S. Ramberger, G. DeMichele, M. Jarosz, J. Borkowski, F. Grespan Power Splitter Discussion on the paper on the asymmetric Power Divider: the paper describe...
Minutes RF structure meeting on PIMS mechanics 20.03.2009 Pr...
Minutes of the informal Linac4 Diagnostics Working Group Meeting focused on profile measurements with 160 MeV H held on 13 July 2009 Present: C.Dutriat, B.Cheymol...
F. Gerigk, G. DeMichele, M. Jarosz, J. Borkowski General Disccussion on the circuital model for the power splitter. Updating LabVIEW programs for...
F. Gerigk, G. DeMichele, M. Schuh, M. Jarosz, J. Borkowski, F. Grespan General Approved medium term plan, which includes: Upgrade of SM18 test...
F. Gerigk, S. Ramberger, G. DeMichele, M. Schuh, F. Grespan General 3 students from Poland are arriving on 01/07/09. They will stay for 3 months and are...
Mandate and Organisation organisation presentation by R. Garoby EDMS: 993696 1 April 2009 of radiation protection work between EN STI and DG SCR minutes...
F. Gerigk, S. Ramberger, G. DeMichele, DTL At this point it is not clear if Bilbao is still going to build LINAC4 DTL drift tube prototypes....
Summary of the meeting at CERN on the construction of the buncher cavity, 12 June 2009 place: CERN, Switzerland present: F. Gerigk, R. Kisiel, J. Kopec, S. Mathot...
Summary of the meeting at CERN on EB welding for the PIMS, 11 June 2009 place: CERN, Switzerland present: G. Favre, F. Gerigk, R. Kisiel, J. Kopec, T. Tardy...
S. Ramberger, G. DeMichele, M. Schuh, F. Grespan DTL Bead Pull measurements: difficulty to obtain a field flatness better than 10% on the cold model...
Technical drawings (restricted access) FrankGerigk 27 May 2009
klystron partitioning Linac4 cavity type number LEP klystron 352 MHz high power klystron Timestamp RFQ 1 1 13 August 2007 DTL 1 1...
Minutes RF structure meeting 15.05.2009 F. Gerigk, S. Ramberger, G. DeMichele General The version of the work package description on the accelerating structures...
Minutes RF structure meeting 08.05.2009 S. Ramberger, G. DeMichele, F. Grespan DTL DTL design: discussion about the distance between Tank1 and Tank...
SPL Web Preferences The following settings are web preferences of the SPL web. These preferences overwrite the site level preferences in . and...
Minutes RF structure meeting on PIMS mechanics 23.04.2009 Pr...
Minutes RF structure meeting 23.04.2009 F. Gerigk, S. Ramberger, G. DeMichele, F. Grespan PIMS (FrankGerigk) Welding Test (Soltan Institute): the welding...
Minutes RF structure meeting 17.04.2009 F. Gerigk, J. Stovall, G. DeMichele, F. Grespan HOM Simulation results on the HOM effect for different code inputs...
Minutes of the SPL steering group meeting no. 17 date: 12 March 2009 present: S. Calatroni, E. Ciapala, R. Garoby, F. Gerigk, V. Parma, M. Vretenar, W. Weingarten...
Minutes/talks of collaboration meetings in Indico SPL collaboration meeting, 11/12 December SPL/ESS B, 10. September 2008 Soltan Institute, 18. November 2008 FrankGerigk...
Minutes of the SPL Coordination meetings 2009 meetings link to indico meeting 17 (12 Mar 09) organisation of working groups 2008 meeting 15 (31 Oct...
Minutes RF structure meeting 08.04.2009 F. Gerigk, S. Ramberger, M. Schuh, G. DeMichele, F. Grespan DTL Prototype still not leak tight after check with...
References to similar work system for the PEP storage ring M.A. Allen, L.G. Karvonen, J. L. Pellegrin, P.B. Wilson, SLAC PUB 1898 (1977). LEP main ring accelerating...
Minutes RF structure meeting 04.04.2009 S. Ramberger, M. Schuh, G. DeMichele, F. Grespan DTL Prototype still not leak tight after check with PVC plugs...
Minutes RF structure meeting 27.03.2009 S. Ramberger, G. DeMichele, F. Grespan LINAC4 (General) Debuncher: discussion with Giovanni about the painting...
Minutes of the Booster Commissioning Working Group held on 19th of March 2009 Present: W. Weterings, J. Borburgh, C. DeAlmeida Martins, Y. Kadi, R. Rocca, O. Aberle...
Minutes RF structure meeting 20.03.2009 S. Ramberger, G. DeMichele, F. Grespan LINAC4 (General) discussion on the de buncher phase problem, in particular...
Minutes of the Booster Commissioning Working Group held on 6th of November 2008 Present: W. Weterings, J. Borburgh, A. Lokhovitskiy, I. Kozsar, C. DeAlmeida Martins...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 12 March 2009 Present: U.Raich, J.Tan, G.Bellodi, L.Soby, G.Tranquille, C.Dutriat, B.Cheymol, E...
Minutes of the SPL steering group meeting no. 14 date: 17 October 2008 present: O. Brunner, E. Ciapala, R. Garoby, F. Gerigk, A. Lombardi, W. Weingarten Agenda...
Minutes of the SPL steering group meeting no. 15 date: 31 October 2008 present: O. Brunner, E. Ciapala, R. Garoby, F. Gerigk, R. Losito, J. Tuckmantel, W. Weingarten...
Minutes RF structure meeting 06.03.2009 F.Gerigk, S. Ramberger, M. Schuh, G. DeMichele, F. Grespan LINAC4 (General) (FrankGerigk) Linac4 commissioning...
Minutes RF structure meeting 27.02.2009 F.Gerigk, M. Schuh, G. DeMichele, F. Grespan CCDTL (FrankGerigk) material specifications to the CERN Purchase...
Minutes RF structure meeting 13.02.2009 F.Gerigk, S. Ramberger, G. DeMichele, F. Grespan CCDTL Awaiting authorisation from CERN Management for increased...
Event Calendar 2008 28 Jan 2008 29 Jan 2008 design review 8 Apr 2008 9 Apr 2008 kick off 30 Apr 2008 SPL review 23 Jun 2008 27 Jun...
Minutes RF structure meeting 20.02.2009 F.Gerigk, M. Schuh, G. DeMichele, F. Grespan CCDTL green light from CERN management to go ahead with the ISTC...
Minutes RF structure meeting 13.02.2009 F.Gerigk, S. Ramberger, G. DeMichele, F. Grespan CCDTL Awaiting authorisation from CERN Management for increased...
DTL structure meeting 30.01.2009 S. Ramberger, R. Wegner, G. DeMichele, F. Grespan DTL Power Coupler Simulations Power Coupler 3D simulations with MWS...
Minutes RF structure meeting 05.02.2009 F.Gerigk, S. Ramberger, M. Schuh, G. DeMichele, F. Grespan CCDTL Kickoff Meeting 07 09.04.09 Awaiting authorisation...
Beam dynamics followups End to end simulation of TL with a bigger emittance beam from the source (50% higher?) Study tilt distribution of DTL gap errors repeat...
Minutes RF structure meeting on PIMS mechanics 08.01.2009 1. Principe d #8217;alignement des disques et anneaux Le design actuel pr...
Minutes of the Booster Commissioning Working Group held on 22nd of May 2008 Present: K. Hanke, J. Borburgh, W. Weterings, B. Mikulec. Agenda: 1. Communications...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 19 January 2009 Present: U.Raich, J.Tan, G.Bellodi, L.Soby, G.Tranquille, C.Dutriat, F.Lenardon...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 8 December 2008 Present: U.Raich, J.Tan, G.Bellodi, M.Ludwig, C.Dutriat, B.Cheymol, L.Soby, E.Bravin...
Minutes RF structure meeting 16.01.2009 M. Vretenar, F.Gerigk, S. Ramberger, R. Wegner, M. Schuh, G. DeMichele, F. Grespan PIMS Several option to lower...
Minutes RF structure meeting 09.01.2009 M. Schuh, F.Gerigk, G. DeMichele, F. Grespan, R. Wegner, M. Vretenar PIMS New cost estimation for copper material...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 1 September 2008 Present: U.Raich, G.Bellodi, G.Tranquille, M.Pasini, A. Lokhovitskiy, C.Dutriat...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 23 June 2008 Present: U.Raich, J.Tan, C.Dutriat, C.Vuitton, M.Pasini, K.Hanke, B.Mikulec. Agenda...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 19 May 2008 Present: C.Dutriat, E.Sargsyan, U.Raich, J.Tan, F.Lenardon, G.Tranquille, E.Bravin,...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 14 January 2008 Present: E.Bravin, C.Dutriat, K.Hanke, T.Lefevre, A.Lokhovitskiy, B.Mikulec, M...
Minutes RF structure meeting 09.12.2008 M. Schuh, F.Gerigk, G. DeMichele, F. Grespan, R. Wegner PIMS simulation results for the PIMS wave guide coupler...
Minutes RF structure meeting on PIMS mechanics 27.11.2008 Commande mati...
Minutes RF structure meeting 28.11.2008 F.Gerigk, S. Ramberger, G. De Michele, F. Grespan DTL 3D simulation (HFSS) of the Prototype (without post couplers...
Minutes RF structure meeting 14.11.2008 M. Schuh, M. Vretenar, G. DeMichele, S. Ramberger, R. Wegner, N. Alharbi DTL First measurment results:...
Minutes RF structure meeting 14.11.2008 M. Vretenar, F.Gerigk, S. Ramberger, R. Wegner, F. Grespan, N. Alharbi, M. Schuh DTL Bead Pull measurements done without...
Minutes RF structure meeting 07.11.2008 M. Schuh, F. Gerigk, G. DeMichele, S. Ramberger, R. Wegner, F. Grespan Buncher Cavity: full job (construction, frequency...
Minutes of the SPL working group meeting no. 89 (draft) date: 19. November 2008 present: P. Baudrenghien (AB/RF), O. Brunner (AB/RF), C. Carli (AB/ABP), E. Ciapala...
SPL/Soltan Institute (IPJ) Poland collaboration meeting, 18.11.2008 present: Slawomir Wronka, Alessandra Lombardi, Ed Ciapala, Olivier Brunner, Vittorio Parma...
Minutes of the SPL study group shortcuts to 2002, 2003, 2004, 2005, 2006, 2007 minutes (from #51 onwards) 2008 meetings meeting 89 (19 Nov 08) LLRF, HOMs, collaborations...
Minutes RF structure meeting on PIMS mechanics 16.10.2008 present: P. Bourquin, G. Favre, J M. Geisser, L. Gentini, F. Gerigk, J M. Lacroix, S. Mathot, M. Polini,...
Minutes RF structure meeting on PIMS mechanics 30.10.2008 Commande mati...
HIPPI meetings WP2 meeting (normal conducting accelerating structures) combined with Linac4 accelerating structures review 24th/25th May 2007 link WP4 meeting (chopper...
Minutes RF structure meeting on PIMS mechanics 02.10.2008 present: G. Favre, J M. Geisser, F. Gerigk, J M. Lacroix, M. Polini, S. Sgobba, T. Tardy, R. Wegner 1. Commande...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 3 November 2008 Present: D.Gerard, G.Tranquille, L.Soby, C.Dutriat, E.Bravin, B.Mikulec. Agenda...
Minutes of the SPL steering group meeting no. 13 date: 19 September 2008 present: E. Ciapala, R. Garoby, F. Gerigk, A. Lombardi, R. Losito, M. Vretenar, W. Weingarten...
Minutes of the SPL working group meeting no. 88 (draft) date: 15. October 2008 present: A. Bertarelli (TS/MME), S. Calatroni (TS/MME), E. Ciapala (AB/RF), C....
Minutes of the SPL working group meeting no. 87 date: 9. September 2008 present: G. Bellodi (AB/BI), S. Calatroni (TS/MME), C. Carli (AB/ABP), F. Caspers (AB...
Minutes RF structure meeting on PIMS mechanics 24.07.2008 present: G. Favre, J M. Geisser, A. Gerardin, F. Gerigk, J M. Lacroix, M. Polini, S. Sgobba, T. Tardy, R...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 6 October 2008 Present: U.Raich, L.Soby, F.Lenardon, A.Lokhovitskiy, C.Dutriat, E.Bravin, I.Kozsar...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 7 July 2008 Present: U.Raich, C.Dutriat, E.Bravin, G.Tranquille, G.Bellodi, B.Goddard, K.Hanke,...
Minutes of the SPL steering group meeting no. 12 date: 1 August 2008 present: O. Brunner, R. Garoby, F. Gerigk, A. Lombardi, J. Tuckmantel, W. Weingarten Agenda...
Minutes of the SPL working group meeting no. 86 date: 4. July 2008 present: G. Bellodi (AB/BI), A. Bertarelli (TS/MME), P. Bourquin (TS/MME), S. Calatroni (TS...
SPL/ESS B 10. September 2008 initiative V. Etxebarria superconducting proton Linac for the ESS Bilbao F.J. Bermejo Issues for the CERN accelerator...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 5 May 2008 Present: C.Dutriat, E.Sargsyan, U.Raich, L.Soby, J.Tan, G.Tranquille, E.Bravin, K.Hanke...
Seminars and conference presentations on Linac4 2008 Dynamics in Linac4 at CERN, A. Lombardi (presented by F. Gerigk), HB`08, August 2008 2007 Shape and...
Minutes of the Booster Commissioning Working Group held on 3rd of July 2008 Present: K. Hanke, W. Weterings, B. Mikulec. Agenda: 1. Communications 1. Follow...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 28 July 2008 Present: U.Raich, G.Bellodi, K.Hanke, A.Lombardi, A.Lokhovitstkiy. Agenda: 1. Communications...
Minutes RF structure meeting on PIMS mechanics 17.07.2008 present: P. Bourquin, G. Favre, F. Gerigk, J M. Lacroix, S. Mathot, M. Vretenar, R. Wegner 1. Tuning sur...
Why is there no left bar PeterJones 23 Jul 2008
Minutes of the SPL steering group (draft) meeting no. 11 date: 11 July 2008 present: E. Ciapala, R. Garoby, F. Gerigk, J. Tuckmantel, M. Vretenar Agenda 1....
Minutes RF structure meeting on PIMS mechanics 03.07.2008 present: P. Bourquin, G. Favre, F. Gerigk, J M. Lacroix, M. Polini 1. Tuning Solution retenue: Tuning...
Minutes RF structure meeting 11.07.2008 F. Gerigk, G. DeMichele, M. Pasini, S. Ramberger, M. Vretenar, R. Wegner CCDTL: We have to check if E. Mauros simulations...
Minutes of the SPL steering group meeting no. 10 date: 6 June 2008 present: O. Brunner, E. Ciapala, R. Garoby, F. Gerigk, R. Losito, V. Parma, C. Rossi, M. Vretenar...
Minutes of the SPL steering group meeting no. 3 date: 23. November 2007 present: S. Calatroni, R. Garoby, F. Gerigk, A. Lombardi, R. Losito, V. Parma, C. Rossi...
Minutes of the Booster Commissioning Working Group held on 20th of December 2007 Present: W. Weterings, A. Lombardi, K. Hanke, T. Zickler, C. De Almeida Martins...
Minutes of the Booster Commissioning Working Group held on 7th of February 2008 Present: K. Hanke, T. Zickler, C. Carli, C. De Almeida Martins, B. Mikulec. Agenda...
Closed Actions Booster Commissioning Working Group BettinaMikulec 04 Dec 2007
Open Actions Booster Commissioning Working Group BettinaMikulec 04 Dec 2007
Action List Booster Commissioning Working Group OpenActionsBCWG ClosedActionsBCWG BettinaMikulec 04 Dec 2007
Meeting on Diagnostics for Linac 4 28/03/06 L4: K.Hanke, M.Pasini AB/BI: C.Dutriat, F.Lenardon, U...
BI Linac4 meeting of Wednesday 11th October 2006 Minutes by M. Pasini and K. Hanke Present: M. Pasini, K. Hanke, U. Raich, L. Soby, C. Dutriat, E. Bravin, G. Tranquille...
BI Linac4 meeting of Wednesday 25th October 2006 Minutes by M. Pasini and K. Hanke Present: M. Pasini, K. Hanke, U. Raich, L. Soby, C. Dutriat, E. Bravin, G. Tranquille...
BI Linac4 meeting of Wednesday 8th November 2006 Minutes by M. Pasini and K. Hanke Present: M. Pasini, K. Hanke, U. Raich, L. Soby, C. Dutriat, E. Bravin, J.J. Gras...
BI Linac4 meeting of Friday 24th November 2006 Minutes by M. Pasini and K. Hanke Present: M. Pasini, K. Hanke, U. Raich, L. Soby, F. Lenardon, J.J. Gras, M. Ludwig...
BI Linac4 meeting of Thursday 14th December 2006 Minutes by M. Pasini and K. Hanke Present: M. Pasini, K. Hanke, U. Raich, L. Soby, F. Lenardon, G.Tranquille, C...
BI Linac4 meeting of Friday 26th January 2007 Minutes by K.Hanke Present: M. Pasini, K. Hanke, U. Raich, G.Tranquille Agenda: 1. general communications. K. Hanke...
BI Linac4 meeting of Monday 26th February 2007 Minutes by K.Hanke and M. Pasini Present: M. Pasini, K. Hanke, U. Raich, E.Bravin, L.Soby Agenda: 1. Matters arising...
BI Linac4 meeting of Wenesday 28th March 2007 Minutes by K.Hanke and M. Pasini Present: M. Pasini, K. Hanke, U. Raich, E.Bravin, L.Soby, G.Tranquille Agenda:...
BI Linac4 meeting of Thursday 26th April 2007 Minutes by K.Hanke Present: C.Dutriat, K.Hanke, I.Kozsar, T.Lefevre, M.Ludwig, M.Pasini, U.Raich, L.Soby, G.Tranquille...
BI Linac4 meeting of Monday 3rd September 2007 Minutes by K.Hanke Present: M. Pasini, K.Hanke, U.Raich, B.Mikulec Agenda: 1. Design of SEM grids for Linac4...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 24 September 2007 Present: E.Bravin, Y.Cuvet, D.Gerard, K.Hanke, F.Lenardon, M.Pasini, U.Raich,...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 8 October 2007 Present: Y.Cuvet, K.Hanke, B.Mikulec, C.Vuitton Agenda: 1. Communications...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 22 October 2007 Present: E.Bravin, C.Dutriat, K.Hanke, T.Lefevre, F.Lenardon, B.Mikulec, M.Pasini...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 5 November 2007 Present: G.Bellodi, E.Bravin, C.Dutriat, K.Hanke, T.Lefevre, F.Lenardon, A.Lokhovitskiy...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 19 November 2007 Present: G.Bellodi, E.Bravin, C.Dutriat, D.Gerard, K.Hanke, T.Lefevre, A.Lokhovitskiy...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 3 December 2007 Present: C.Dutriat, K.Hanke, T.Lefevre, A.Lokhovitskiy, M.Pasini, U.Raich, L.Soby...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 17 December 2007 Present: E.Bravin, C.Dutriat, B.Goddard, K.Hanke, T.Lefevre, M.Ludwig, M.Pasini...
Closed Actions, Diagnostics KlausHanke 18 Sep 2007
Open Actions, Diagnostics KlausHanke 18 Sep 2007
Action list Diagnostics Group OpenActionsBI ClosedActionsBI KlausHanke 18 Sep 2007
Minutes of the Linac4 Diagnostics Working Group Meeting held on 18 February 2008 Present: E.Bravin, C.Dutriat, K.Hanke, T.Lefevre, M.Pasini, U.Raich, E.Sargsyan...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 10 March 2008 Present: E.Bravin, C.Dutriat, J.Tan, U.Raich, F.Lenardon, K.Hanke, E.Sargsyan, M.Eshraqi...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 7 April 2008 Present: E.Bravin, U.Raich, K.Hanke, E.Sargsyan, M.Eshraqi, L.Soby, A.Lokhovitskiy...
Minutes of the Linac4 Diagnostics Working Group Meeting held on 9 June 2008 Present: A.Lombardi, E.Bravin, U.Raich, J.Tan, K.Hanke, B.Mikulec. Agenda: 1. Communications...
Document 886734 21.12.2007 Minutes of the Linac4 Workpackage Holders #8217; Meeting #8211; December 18th, 2007 Distribution: Richard Scrivens; Serge Mathot;...
under construction... FrankGerigk 06 Feb 2008
Minutes of the Linac4 Workpackage Holders #8217; Meeting #8211; April 22nd, 2008 Distribution: Richard Scrivens; Serge Mathot; Alessandra Lombardi; Frank Gerigk...
Minutes of the Linac4 Technical Design Committee meeting no. 1 date: 04 April 2006 present: AB/RF M. Pasini, J. Broere, R. Wegner, C. Rossi, O. Brunner, M...
Minutes of the Linac4 Technical Design Committee meeting no. 2 date: 02 May 2006 present: AB/RF F. Gerigk, M. Pasini, J. Broere, R. Wegner, M. Vretenar...
Minutes of the Linac4 Technical Design Committee meeting no. 3 date: 13 June 2006 present: AB/RF M. Pasini, J. Broere, R. Wegner, C. Rossi, M. Paoluzzi, M...
Minutes of the Linac4 Technical Design Committee meeting no. 4 date: 25 July 2006 present: AB/RF F. Gerigk, M. Pasini, R. Wegner, C. Rossi, M. Paoluzzi, M...
Minutes of the Linac4 Technical Design Committee meeting no. 5 date: 5 September 2006 present: AB/RF M. Pasini, R. Wegner, C. Rossi, M. Paoluzzi, M. Vretenar...
Minutes of the Linac4 Technical Design Committee meeting no. 6 date: 10 October 2006 present: AB/RF M. Pasini, J. Broere, F. Gerigk, C. Rossi, M. Vretenar...
Minutes of the Linac4 Technical Design Committee meeting no. 7 date: 06 December 2006 present: AB/RF M. Pasini, F. Gerigk, P. Baudrenghien, R. Wegner, C....
Minutes of the Linac4 Project meetings meeting no. 1 date: 04 September 2007 distribution: M. Vretenar; S. Maury; A. Lombardi; F. Gerigk; C. Rossi; K. Hanke;...
Minutes RF structure meeting on PIMS mechanics 26.06.2008 present: P. Bourquin, G. Favre, F. Gerigk, J M. Lacroix, M. Polini, T. Tardy, R. Wegner changements par rapport...
Minutes RF structure meeting on PIMS mechanics 19.06.2008 present: P. Bourquin, G. Favre, J M. Geisser, F. Gerigk, J M. Lacroix, M. Polini, T. Tardy, M. Vretenar,...
Minutes Diagnostics Working Group meeting 11.10.2007 N. Alharbi, F. Gerigk, M. Pasini, S. Ramberger, C. Rossi, M. Vretenar, R. Wegner news facts: L4 siting...
Minutes RF structure meeting 22.5.2007 F. Gerigk, M. Pasini, S. Ramberger, M. Vretenar, R. Wegner news facts: RW, MV: waveguide losses: 1% in straight waveguides...
Minutes RF structure meeting 07.06.2007 N. Alharbi, F. Gerigk, M. Pasini, S. Ramberger, M. Vretenar, R. Wegner news facts: klystron in 3 MeV test stand should...
Minutes RF structure meeting 19.07.2007 F. Gerigk, S. Ramberger, M. Vretenar, R. Wegner news facts: high power test of Russian CCDTL prototype Rolf checked the...
Minutes RF structure meeting 02.08.2007 F. Gerigk, M. Pasini, S. Ramberger, M. Vretenar, R. Wegner news facts: the final draft of a technical note on Linac...
Minutes RF structure meeting 09.08.2007 F. Gerigk, M. Pasini, S. Ramberger, M. Vretenar news facts: high power test stand in SM18 will be available at least...
Minutes RF structure meeting 22.08.2007 N. Alharbi, F. Gerigk, M. Pasini, S. Ramberger, M. Vretenar, R. Wegner news facts: DTL cold model the machining...
Minutes RF structure meeting 02.11.2007 F. Gerigk, G. Michele, M. Pasini, S. Ramberger, C. Rossi, M. Vretenar, R. Wegner news facts: DTL cold model the...
Minutes RF structure meeting 09.11.2007 F. Gerigk, M. Pasini, S. Ramberger, C. Rossi, M. Vretenar, R. Wegner news facts: DTL cold model first bead pull...
Minutes RF structure meeting on PIMS mechanics 10.04.2008 present: P. Bourquin, G. Favre, F. Gerigk, J M. Lacroix, I. Sexton, M. Vretenar, R. Wegner excused: R. De...
Minutes RF structure meeting on PIMS mechanics 08.05.2008 present: P. Bourquin, R. De Morais Amaral, G. Favre, F. Gerigk, J M. Lacroix, G. Vandoni, M. Vretenar, R...
Minutes RF structure meeting on PIMS mechanics 22.05.2008 present: P. Bourquin, R. De Morais Amaral, G. Favre, F. Gerigk, J M. Lacroix, G. Vandoni, M. Vretenar, R...
Minutes RF structure meeting on PIMS mechanics 12.06.2008 present: P. Bourquin, G. Favre, R. Folch, J M. Geisser, F. Gerigk, J M. Lacroix, S. Mathot, M. Polini, T...
Summary of the meeting at the Soltan Institute, 26 27 February 2008 place: Soltan Institute for Nuclear Physics (IPJ), Swierk, Poland present: F. Gerigk, T. Kurtyka...
IPHI SPL meetings at Saclay, April 2004 MeV front end technical coordination meeting, Saclay, December 2003 at Orsay, October 2003 at CERN, April...
Summary of the CERN VNIIEF Meeting on mechanical design development for ALVAREZ and RFQ DTL prototype accelerators CERN, 6 7 December, 2005 present: VNIIEF: V.T...
CCDTL: extension of #2875, new ISTC project on CCDTL series production, September 07 at CERN list of talks: status of the ISTC project 2875 extension (M. Naumenko...
CCDTL: results of extension of #2875, new ISTC project on CCDTL series production, March 08 at CERN list of talks: and VNIITF participation in Linac4, ppt (A...
Linac4 Review Meetings Review Committee meeting, 29 30 January 2008 accelerating structures review, combined with HIPPI WP2 meeting 24 25 May 2007 FrankGerigk...
Meetings of the Linac4 work package holders shortcuts to 2007 2008 meeting 3 (22 Apr 2008) project status, EVM meeting 2 (06 Feb 2008) project status...
Minutes of the general Linac4 Meetings shortcuts to 2006 2007 meetings (Linac 4 Project Meetings) meeting 1 (14 Oct 2007) general presentation, design revisions...
Minutes of the SPL steering group meeting no. 9 date: 22 May 2008 present: O. Brunner, S. Calatroni, E. Ciapala, R. Garoby, F. Gerigk, A. Lombardi, R. Losito...
Minutes of the SPL steering group meeting no. 8 date: 18 April 2008 present: O. Brunner, S. Calatroni, E. Ciapala, R. Garoby, F. Gerigk, A. Lombardi, R. Losito...
Minutes of the SPL steering group meeting no. 7 date: 14 March 2008 present: S. Calatroni, E. Ciapala, R. Garoby, F. Gerigk, A. Lombardi, V. Parma, C. Rossi,...
Minutes of the SPL steering group (draft !!) meeting no. x date: xx month 200x present: S. Calatroni, R. Garoby, F. Gerigk, A. Lombardi, R. Losito, V. Parma,...
Minutes of the Linac4 civil engineering meetings shortcuts to 2008 2008 meetings 31 Mar 2008 Here you are the minutes of the last L4 TCC, held last monday March...
Please find enclose the minutes of the meeting held on Monday March 31, 2008. RosarioPrincipe 04 Apr 2008
Minutes of the SPL steering group meeting no. 4 date: 7 December 2008 present: E. Ciapala, R. Garoby, F. Gerigk, R. Losito, V. Parma, M. Vretenar, W. Weingarten...
Minutes of the SPL steering group meeting no. 5 date: 1 February 2008 present: S. Calatroni, E. Ciapala, R. Garoby, F. Gerigk, A. Lombardi, R. Losito, M. Vretenar...
Minutes of the civil engineering working group meeting no. xx date: xx. Month 200x present: B.Bla, C.Bla,... agenda 1. General remarks (Author Name) 2....
Minutes of the SPL steering group meeting no. 6 date: 13 February 2008 present: S. Calatroni, R. Garoby, F. Gerigk, R. Losito, W. Weingarten Agenda 1. Cryogenic...
Minutes of the SPL working group meeting no. 85 date: 14. November 2007 present: G. Bellodi, P. Bourquin, C. Carli, E. Ciapala, M. Eshraqi, R. Garoby, F. Gerigk...
TWiki search by CERN Search Results You may also search with the internal TWiki WebSearch . Please note that TWiki internal WebSearch may be very slow for large...
Minutes of the SPL steering group meeting no. 2 date: 09. November 2007 present: E. Ciapala, R. Garoby, F. Gerigk, A. Lombardi, R. Losito, V. Parma, C. Rossi...
Minutes of the SPL steering group meeting no. 1 date: 26. October 2007 present: E. Ciapala, R. Garoby, F. Gerigk, A. Lombardi, R. Losito, V. Parma, C. Rossi...
2007 Calendar 4 Sep 2007 Linac4 kick off meeting 10 Sep 2007 11 Sep 2007 ESGARD, FP7 20 Sep 2007 SPL meeting 26 Sep 2007 28 Sep...
Minutes of the SPL working group meeting no. 79 date: 10 May 2006 present: G. Bellodi, F. Caspers, C. De Almeida Martins, R. Garoby, F. Gerigk, K. Hanke, D....
Action list of the SPL core group OpenActionsSPLSteeringGroup ClosedActionsSPLSteeringGroup FrankGerigk 29 Oct 2007
Closed Actions, SPL Steering Group FrankGerigk 29 Oct 2007
members of the mailing list FrankGerigk 27 Nov 2007
1 Web Create New Topic Index Search Changes Notifications Statistics Preferences TWiki Text Formatting Rules...
Minutes of the Linac4 Project meetings meeting no. 1 date: xx. Month 200x distribution: M. Vretenar; S. Maury; A. Lombardi; F. Gerigk; C. Rossi; K. Hanke; R....
Minutes of the Linac4 Technical Design Committee meeting no. 1 date: xx. Month 200x present: AB/RF M. Pasini, J. Broere, R. Wegner, C. Rossi, M. Paoluzzi...
Minutes of the SPL working group meeting no. 80 date: 14. June 2006 present: G. Bellodi, F. Caspers, R. Garoby, F. Gerigk, K. Hanke, A. Lombardi, M. Magistris...
Minutes of the SPL working group meeting no. xx date: xx. Month 200x present: G. Bellodi, P. Bourquin, C. Carli, F. Caspers, S. Cousineau (ORNL), C. De Almeida...
Minutes of the SPL working group meeting no. 81 date: 16. August 2006 present: G. Bellodi, P. Bourquin, M. Eshraqi, R. Garoby, F. Gerigk, J. B. Lallement, S...
Minutes of the SPL working group meeting no. 82 date: 13. December 2006 present: G. Bellodi, P. Bourquin, C. Carli, F. Caspers, S. Cousineau (ORNL), C. De Almeida...
Minutes of the SPL working group meeting no. 83 date: 11. April 2007 present: G. Bellodi, P. Bourquin, C. Carli, F. Caspers, C. De Almeida Martins, M. Eshraqi...
Minutes of the SPL working group meeting no. 84 date: 20. September 2007 present: Y. Body, L. Bruno, C. Carli, E. Ciapala, C. de Almeida Martins, M. Eshraqi,...
Open Actions SPL Steering Group FrankGerigk 29 Oct 2007
Minutes of the SPL civil engineering meetings 04. October 2007 13. September 2007 30. August 2007 FrankGerigk 24 Oct 2007
Linac4 RF Structures Action List OpenActionsRF ClosedActionsRF FrankGerigk 18 Sep 2007
Closed Actions, RF structures FrankGerigk 18 Sep 2007
Open Actions, RF structures FrankGerigk 18 Sep 2007
TT7 is used for radioactive material and can be interlocked when the SPL is running, the radioactivity of TT7 will not prevent digging the SPL tunnel, TTL2 is no...
Result from PMQ request Dear all, I just looked again at the offer we have from Vacuumschmelze: dia 7.5mm x length 40mm magnetized VACOMAX 225 HR (Sm2Co17) 900 pieces...
Linac4 shunt impedance, 80% scaled from Superfish, including the losses for stems, end walls, coupling holes, etc. FrankGerigk 12 Jun 2007
TWiki`s SPL web The 1 web of TWiki. TWiki is a Web Based Collaboration Platform for the Enterprise.
/SPL The 1 web of TWiki. TWiki is a Web Based Collaboration Platform for the Enterprise.
TWeeder info for SPL Total Number of topics: 425 0 Topics updated during the last 7 days Days Web Topic Date 0 Topics updated during the last...
Number of topics: 424

Show recent changes with 50, 100, 200, 500, 1000 topics, all changes

Related topics: RSS feed, rounded corners RSS feed, ATOM feed, WebNotify, site changes, site map

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2006-11-15 - TWikiContributor
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright