2013-09-18 – I have printed a poster for SSD’17 conference
2013-09-17 – I have made electrical test of the flanges in Christians laboratory; the flanges are ok from electrical point of view.
2013-09-17 – Franck has made leak-tightness test of two special flanges; the flanges are leak-tight, official results will be publish soon.
2013-09-16 – We have received two ISO K DN200 elbows (90 degrees) and four ISO K DN200 centring rings.
2013-09-16 – I have met Jacek and Jan and I have learned that at CERN is possible to make bonding
2013-09-13 – I have printed a poster for IBIC’13 conference.
2013-09-13 – We have received two special flanges with eight welded SMA connectors each.
2013-09-12 – I have met Delio and we have discussed diamond detector – holder issue. According to him beryllium spring cover by gold should be good solution for 20 years in vacuum in cryogenic temperature.
2013-09-10 – Article titled “Cryogenic Beam Loss Monitors (CryoBLM) for the LHC” by Marcin Bartosik, Bernd Dehning, Barbara Holzer, Christoph Kurfuerst and Mariusz Sapinski, BE-BI-BL was published in 8th issue of Beams Department Newsletter. (link)
2013-09-07 – I have presented latest news about the project on students meeting (link)
2013-09-07 – Pierre-Francois Ducommun from DYNEOS visited CERN and my office; we have discussed about possible UV laser construction.
2013-09-04 – W have received special SMA flanges from Hositrad.
2013-09-03 – I have presented latest news about cryostat on PSEAIRRAD meeting (link)
2013-08-23 – Next Monday on 15:00 I am going to meet with Valentine Fedosseev from ISOLDE and discuss UV laser topic.
2013-08-20 – Cryogenic BLM’s project will be presented on poster session of the IBIC’13 conference.