General Information
Activity
ICEPP-Kobe Joint meeting
Beam test (in Japan)
Chamber (made in Japan)
* 10cm*10cm small chamber for test
mmdaq set up etc
Kobe Neutron beam test (2013.6)
- Aim of beam test
- spark tolerance with new chamber
- study of neutron/gamma separation and neutron flux with liquid scintillator
- beam test log : Log file
- beam test data SRS (Run 285-750) : ~kataoka/maxi82/mm/2013/icepp/APV25** (CERN)
- beam test data camac : ~kataoka/maxi82/mm/2013/camac/data (CERN)
Spring8 LEPS electron beam line (2013.11)
- Aim of beam test :
- Position/timing resolution with charged particle
- Angle scan and HV scan, comparison of angle/position resolution with microTPC mode
- bem test log : Log file
- beam test data SRS (Run 763-1318) : ~kataoka/maxi82/mm/2013/icepp/APV25** (CERN)
- beam test data camac : ~kataoka/maxi82/mm/2013/camac/data (CERN)
Kobe Neutron beam test(2014.1)
- Aim of beam test : *??
- beam test log : Log file
- beam test data : ~kataoka/maxi82/mm/2013/icepp/APV25** (CERN)
Kobe Neutron beam test(2014.7)
- Aim of beam test :
- Study of spark rate depending on beam current
- Cosmic data taking under the neutron background environment
- beam test log : Log file
- beam test data SRS (Run130-208) : ~kataoka/maxi82/mm/2014/icepp/APV25(or APV25.processed3) (CERN)
- beam test data camac ::?
Beam test (in CERN etc.)
Preparation and Requirement
Dosimetry
- Regular dosimetry (long term)
- Requirement : CERN ID, level 1&2 safety course, radiological safety course (F), medical cirtificate
- Short term (temporary) dosimetry : Only once per year (max. 2 months)
* CERN ID, level 1&2 safety course
Safety course
- level 1&2 Link
- Radiological safety training EDH->Training Catalogue->Safety
Before test beam shift
- Access Request in EDH (Select your shift area,(e.g. Blg.887 H6 and 0157-R-012)
Chamber in CERN beam test
Type |
Resistive strip type |
Resistive strip pitch |
Amp. gap |
Drift gap |
Mesh |
Comment |
T2 |
Print Screen |
400um |
128um? |
5mm |
|
Similar to Jx chamber? |
Tmm2/3/5/6 |
Print Screen |
250um |
5mm |
? |
Fix |
Used for telescope in test beam, XY 2D readout (X readout is in parallel with resistive strip) |
TQF |
Print Screen |
400um |
? |
5mm |
|
Resistive foil and read-out has been mis-alighed (normal, +1dgee, -2 dgree, half-pitch shift) |
ExMe |
Print Screen |
400um |
? |
5mm |
|
Mesh opening window, diameter difference |
MSW1 |
Sputter |
415um |
128um |
5mm |
|
MicroMegas for Small wheel |
MSW2 |
Sputter |
415um |
128um |
5mm |
|
MicroMegas for Small wheel |
CERN beam test DAQ set up and how to run
- Run SRSDCS_1.5.4 from desktop
- connect the system to the FEC 10.0.0.14 (/home/dateuser/Desktop/MMs_30sept_2014_DAQ/config/XXXXX), load configuration file sdc_FEC_14.txt
- open SRSDCS program and connect to the 10.0.0.14, apply the external trigger and enable the data acquisition
- Starting the program
- ./mmdaq3_server (/home/dateuser/Desktop/MMs_30_sept_2014_DAQ/mmdaq3-server)
- ./browser --online (/home/dateuser/Desktop/MMs_30sept_2014_DAQ/GUI)
- From GUI, load the config file (e.g. /home...../Config/TestBeam_MMSW.../DAQ_config.xml)
- Run (pedestal)
- select Pedestals n Run type, check "write the file", start run (change trigger switch in rack)
- check the quality
- Run (physics)
- check trigger switch,
- load pedestal file, check "write the file", then select Physics in Run type
CERN PS(2014.8) : T9 beam line (bld. 157), 10 GeV pi or p.
- Aim of beam test :
- MSW : Uniformity check (HV, position scan)
- TQF1 : Resistive foil, readout strip alignment check
- ExMe : Pillar choice check
- Electric log book : e-log
- beam test data : lxatut01:~/kataoka/maxi82/mm/2014.cern/TestBeam_08_2014/data (CERN, b188) or /afs/cern.ch/user/m/muoncali/afs_workspace/public/ (CERN afs)
CERN PS(2014.10) : T10 beam line (bld. 157), 10 GeV pi or p
* Aim of beam test :
-
- MSW : Uniformity check (HV, position scan)
- TQF1 : Resistive foil, readout strip alignment check
- ExMe : Pillar choice check
- Electric log book : e-log
- beam test data :
CERN SPS(2014.10) : H6 beamline (bld. 887), Control room at HNA447), 120 GeV pi+ 10kHz; spill duration =9s
- Aim of beam test
- VMM1/2 chip test
- Combined test beam with sTGC
- Angular scan of TQF1
- Mesh study with ExMe (70/30 vs 50/28) (open window/diameter)
- MSW2 studies
- Electric log book : e-log
- beam test data : (to be filled)
CERN SPS (2014.11) :
- Aim of beam test
- Magnetic field
- VMM2 chip test
QA,QC for NSW mass production
Resistivity check
Strip pattern scan
Useful Info
TDR
Technical Design Report
MicroMegas Twiki
Training (software)
mmdaq etc
VMM1 info (a bit obsolete)
Talk/Paper
Link
- Garfield++ : Simulation of tracking detectors : Link
- Geant4 : Simulation chamber geometry etc : Link
- Spice : Simulation of electronic circuit : Link
--
TatsuyaMasubuchi - 20 Oct 2014