approved Introduction 900 GeV 3b/12b

The new Glance interface Phase 0 (link) for analysis paper tracking has been designed with the physics analysis and publication workflow in mind. The currently existing documentation is tailored towards this, neglecting somewhat the fact that this new interface is intended to be used by all of ATLAS to track PUB notes, CONF notes and Papers. The documentation below is tuned to the needs of the Trigger and Sub-detector groups.

pending Creation step 13.6 TeV

pending Creation step info needed

Non stable beam requests no stable beam post TS1 post TS2

Purpose: Test the vdM scan and emittance scan procedures (e.g. scanning protocols, ATLAS-LHC interactions) with a single x-y scan to ensure everything is working. Also provides first iteration for initial luminosity calibration of LUCID (see item 2 below).

-- JoergStelzer - 2018-07-07

Edit | Attach | Watch | Print version | History: r10 < r9 < r8 < r7 < r6 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r10 - 2022-03-11 - JoergStelzer
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Sandbox All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback