%CERTIFY%
L1CaloUpgradePhase1Simulation
Introduction
This page documents activities and associated supporting information for simulation studies for the Phase-I upgrade of
L1Calo. The current state-of-play is summarised here and new results, as they arrive, will be indicated. Thus, of necessity, it is an evolving document.
Studies
Supporting h/w design choices
xFex TOB output multiplicities
Priority: initial results are needed by early summer 2014 as input to the eFex prototype (scheduled for manufacture early 2015) design process.
Description: this activity will study the connectivity requirements (including bandwidth, data formats, overflow handling, etc.) between the eFEX modules and
L1Topo modules and the potential impact on physics triggers of any constraints or limitations in this area. The study will use realistic emulations of Trigger Objects reflecting the desired physics goals and take into account the level of pileup that is anticipated. The simulation results will feedback into the eFEX design process and as such will be both timely and have significant importance in the upgrade of
L1Calo at Phase-I.
- Bunch train effects
- Consequences for L1Calo of LPDS design choices
- The gFex
Supporting algorithm choices
e/γ
τ
Jet
Missing Et (and other global event quantities)
Datasets
Major updates:
--
RobinMiddleton - 26 Feb 2014
%RESPONSIBLE%
RobinMiddleton
%REVIEW%
Never reviewed